ASXpress Operator's Manual - CETAC Technologies
ASXpress Operator's Manual - CETAC Technologies
ASXpress Operator's Manual - CETAC Technologies
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ASXpress</strong> Rapid Sample Introduction System Operator’s <strong>Manual</strong><br />
Chapter 5: Using the Rapid Sample Introduction System<br />
5.2 Shutting Down the ASXPRESS Rapid Sample<br />
Introduction System<br />
To shut down the ASXPRESS Rapid Sample Introduction System, complete the<br />
following steps:<br />
1. Drain the system by removing the rinse solution uptake tubing from the<br />
rinse solution sources (autosampler and ICP/ICP-MS). Operate the<br />
autosampler peristaltic pump and ASXPRESS vacuum pump by operating<br />
the “manual cycle” function or by using the manual function for<br />
operating the autosampler peristaltic pump (both from within the<br />
Xpress Configuration Tool software) and manually running the ICP/ICP-<br />
MS peristaltic pump until all solution drains from the tube attached to<br />
the rinse station outlet, the vacuum pump waste discharge, and from<br />
the ICP/ICP-MS nebulizer drain.<br />
Note:<br />
If using a rinse solution other than deionized water, flush the rinse<br />
system with deionized water before shutting down and/or draining the<br />
ASXPRESS discrete Sampling Accessory. For more information, see the<br />
following section, “Flushing the Rinse Station and Flow Path”.<br />
2. Switch the power switch on the back of the autosampler to “Off.”<br />
93