ASXpress Operator's Manual - CETAC Technologies
ASXpress Operator's Manual - CETAC Technologies
ASXpress Operator's Manual - CETAC Technologies
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ASXpress</strong> Rapid Sample Introduction System Operator’s <strong>Manual</strong><br />
Chapter : Index<br />
11 Index<br />
6-port valve<br />
valve. See<br />
avertissements, 131<br />
chemical compatibility, 10<br />
cleaning, 96, 129<br />
commands<br />
autosampler, 123<br />
condensation. See humidity<br />
C-Term, 116<br />
disposal, 132<br />
earthing, 17<br />
electrical characteristics, 126<br />
Enable <strong>ASXpress</strong> Operation, 86<br />
Enable Vacuum Pump Timeout, 87<br />
firmware<br />
upgrading, 70<br />
grounding, 17<br />
humidity, 17, 126, 129<br />
hyperterminal, 119<br />
inject cycle, 9<br />
inject LED, 11<br />
inspection, 88, 99<br />
interference, 132<br />
lights, 11<br />
load cycle, 9<br />
load LED, 11<br />
mains disconnect, 128<br />
Notes, 87<br />
packaging materials, 17<br />
physical characteristics, 16<br />
pollution degree, 126<br />
positioning, 17<br />
power<br />
requirements, 17, 126<br />
power-off procedure, 93<br />
power-on procedure, 92<br />
probe<br />
1.0mm, 12, 56<br />
carbon fiber, 56<br />
connecting, 58<br />
timing, 8<br />
regulatory notices, 126<br />
rinse cycle, 9<br />
rinse timeout, 86<br />
safety information, 126<br />
sample loop, 58<br />
sample probe. See probe<br />
software<br />
installation, 63<br />
supplies, 13<br />
temperature<br />
operating, 126<br />
storage, 10<br />
tubing<br />
connecting, 58<br />
kinks, 17<br />
material, 10<br />
rinse, 52<br />
valve<br />
replacement, 100<br />
retraining, 100<br />
waste routing, 16<br />
WEEE notice, 132<br />
134