28.10.2014 Views

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Suggested Monitoring Regime<br />

Table 74 – Suggested Monitoring of Impacts and Effects of <strong>the</strong> LP on ER06<br />

Indicator to be<br />

monitored<br />

Frequency of<br />

data collection<br />

When should<br />

remedial action be<br />

taken?<br />

What remedial action should be taken?<br />

Impacts<br />

Emissions of CO 2 by<br />

source (LSF Indicator)<br />

Annual<br />

When annual total<br />

emissions of CO 2 by<br />

source show<br />

unfounded increases.<br />

If levels of CO 2 emissions by source show<br />

unexpected increases it will be necessary<br />

to identify <strong>the</strong> cause and undertake an<br />

appropriate remedial action.<br />

Per capita reduction<br />

in CO 2 emissions<br />

(NI186)<br />

Annual<br />

When expected<br />

reduction in CO 2<br />

emissions per capita is<br />

not achieved.<br />

When reduction in CO 2 emissions per<br />

capita is not achieved it will be necessary<br />

to identify <strong>the</strong> cause and undertake an<br />

appropriate remedial action.<br />

Energy use per capita<br />

(LSF Indicator)<br />

Annual<br />

When expected<br />

reduction in energy<br />

use per capita is not<br />

achieved.<br />

When reduction in energy use per capita<br />

is not achieved it will be necessary to<br />

identify <strong>the</strong> cause and undertake an<br />

appropriate remedial action.<br />

Electricity and heat<br />

production from<br />

renewable energy<br />

sources and CHP<br />

located in <strong>the</strong> area<br />

Annual<br />

When a planning<br />

application is<br />

submitted and shows<br />

inadequate levels of<br />

energy provision from<br />

a renewable source.<br />

Greater weight will be given to <strong>the</strong><br />

consideration of air quality and climate<br />

change impacts and <strong>the</strong>ir mitigation.<br />

Conditions will be imposed to increase <strong>the</strong><br />

provision of energy from renewable<br />

sources.<br />

% new homes<br />

achieving Code <strong>for</strong><br />

Sustainable Homes<br />

Levels 3, 4, and 5 and<br />

commercial buildings<br />

meeting BREEAM<br />

‘very good’ or<br />

‘excellent’ standards.<br />

Annual<br />

When a planning<br />

application is<br />

submitted.<br />

Encourage improvement in sustainable<br />

home building and promote development,<br />

which meets Code <strong>for</strong> Sustainable Homes<br />

Levels 3, 4, and 5 and commercial<br />

buildings meeting BREEAM ‘very good’ or<br />

‘excellent’ standards.<br />

Adaptation<br />

Properties at risk of<br />

flooding (LSF<br />

Indicator)<br />

Number of schemes<br />

with flood mitigation<br />

measures<br />

Number of additional<br />

homes where flood<br />

risk has been<br />

reduced (LSF<br />

Indicator)<br />

Annual<br />

When a planning<br />

application is<br />

submitted.<br />

At <strong>the</strong> planning application stage, a Flood<br />

Risk Assessment (FRA) will be required <strong>for</strong><br />

development proposals of 1 hectare or<br />

greater in Flood Zone 1 and all proposals<br />

<strong>for</strong> new development located in Flood<br />

Zones 2 and 3. Assessment of surface<br />

water, drainage, and residual risk will be<br />

required as part of a FRA.<br />

New developments will be encouraged to<br />

use Sustainable Drainage Systems (SUDS)<br />

to manage runoff and reduce flood risk.<br />

Number of planning<br />

permissions granted<br />

in accordance with<br />

<strong>the</strong> advice of <strong>the</strong><br />

Environment Agency<br />

on flood defence<br />

grounds (LSF<br />

Indicator)<br />

Page | 159 Runnymede BC FINAL <strong>Sustainability</strong> <strong>Appraisal</strong> <strong>Report</strong> – Feb 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!