28.10.2014 Views

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cumulative Effects Assessment<br />

12.67 Cumulative effects are possible, but not considered likely to be significant from this receptor<br />

at this time.<br />

Mitigation/Enhancement Recommendations<br />

12.68 Mitigation and enhancement is suggested through <strong>the</strong> June 2012 meetings (See: Appendix 2)<br />

through <strong>the</strong> policy set SP05 ‘Design’ which recommends <strong>the</strong> use of sustainable resources with<br />

regard to <strong>the</strong> type of resources used in development.<br />

Suggested Monitoring Regime<br />

12.69 Within <strong>the</strong> Level 2 policy set it is noted that potential negative effects might be noted <strong>for</strong> <strong>the</strong><br />

built environment in relation to prevention of development o<strong>the</strong>r than residential. However<br />

this is not considered significant as o<strong>the</strong>r development is linked to residential within<br />

Runnymede.<br />

Table 79 – Suggested Monitoring of Impacts and Effects of <strong>the</strong> LP on ER07<br />

Indicator to be<br />

monitored<br />

Frequency of<br />

data collection<br />

When should<br />

remedial action be<br />

taken?<br />

What remedial<br />

action should be<br />

taken?<br />

Total type of all waste<br />

rising and <strong>the</strong> method<br />

used <strong>for</strong> its management<br />

(LSF Indicator)<br />

Annually<br />

When <strong>the</strong> target is<br />

exceeded<br />

Appropriate to<br />

exceedence<br />

Inter regional movement<br />

of waste (LSF Indicator)<br />

Annually<br />

When <strong>the</strong> target is<br />

exceeded<br />

Appropriate to<br />

exceedence<br />

Page | 169 Runnymede BC FINAL <strong>Sustainability</strong> <strong>Appraisal</strong> <strong>Report</strong> – Feb 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!