28.10.2014 Views

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

DRAFT Sustainability Appraisal Report for the Emerging Local Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.41 The approach in Policy LP04 acts as a development control policy <strong>for</strong> <strong>the</strong> town centre in that any<br />

development coming <strong>for</strong>ward will have to largely replicate <strong>the</strong> existing <strong>for</strong>m and function of <strong>the</strong><br />

existing town centre.<br />

4.42 Whereas <strong>the</strong> alternative approach is to not to promote planned growth but to respond to market<br />

driven demand.<br />

Location Policy 5 (LP05) – Royal Holloway UOL<br />

4.43 Royal Holloway University of London brings educational, economic, and social benefits to <strong>the</strong> Borough,<br />

and one of <strong>the</strong> Council’s aspirations is <strong>the</strong>re<strong>for</strong>e to retain RHUL in <strong>the</strong> Borough. However, in common<br />

with o<strong>the</strong>r higher education establishments, RHUL is under increased pressure to develop and grow.<br />

The University is committed to both enhancing its reputation and to maintaining its national position<br />

and Government Policy supports <strong>the</strong> University’s desire <strong>for</strong> <strong>the</strong> future growth of <strong>the</strong> college. The<br />

university is <strong>the</strong>re<strong>for</strong>e developing a masterplan to allow <strong>the</strong> University to grow and maintain its<br />

position, making provision <strong>for</strong> additional floorspace <strong>for</strong> academic and research purposes, student<br />

residences and ancillary support purposes.<br />

4.44 The University wish to remain on <strong>the</strong> campus but indicate that it is too constrained to accommodate<br />

<strong>the</strong>ir growth aspirations. The Council has always wished to retain <strong>the</strong> campus within <strong>the</strong> Borough and<br />

to accommodate growth where consistent with policy. It is <strong>the</strong>re<strong>for</strong>e necessary to consider how we can<br />

develop a policy to reasonably accommodate <strong>the</strong> aspirations of <strong>the</strong> university and retain <strong>the</strong> institution<br />

in <strong>the</strong> Borough, whilst af<strong>for</strong>ding a level of control over future development. At present <strong>the</strong> site is<br />

occupied by College buildings and gardens and has a mixture of college uses. The main College campus<br />

includes <strong>the</strong> Grade I listed Founder’s Building<br />

4.45 The <strong>Local</strong> <strong>Plan</strong> considered three policy options <strong>for</strong> Policy LP05 to deliver its objective and have been<br />

summarised in Table 19. The preferred policy is to allow <strong>the</strong> university to expand on <strong>the</strong> site whilst<br />

remaining in <strong>the</strong> Green Belt.<br />

Table 19 – LP05 Policy Options Considered<br />

Policy and Alternatives Considered<br />

Assessment<br />

ID.<br />

Policy/Alternative Policy Text<br />

Location Policy 5 (LP05) – Royal Holloway UoL<br />

This approach provides Royal Holloway UoL with a level of weight in order to relax <strong>the</strong> strict Green<br />

Belt policy to permit this education provider to meet a goal to accommodate 45% of its students on<br />

site<br />

LP05‐A1 Maintain <strong>the</strong> Green Belt designation and not allow <strong>the</strong> site to expand.<br />

LP05‐A2 Remove <strong>the</strong> site from <strong>the</strong> Green Belt and allow <strong>the</strong> site to expand.<br />

4.46 Royal Holloway UOL Policy LP05 relies upon a ‘Master <strong>Plan</strong>’ coming <strong>for</strong>ward in order to set <strong>the</strong> context<br />

of <strong>the</strong> future development requirements. It is reported to include <strong>the</strong> development of <strong>the</strong> playing field<br />

area to permit <strong>the</strong> accommodation of 45% of <strong>the</strong> total student population by 2031. LP02‐A1 maintains<br />

a strict green belt approach, whilst LP05 –A2 would remove <strong>the</strong> site from <strong>the</strong> green belt.<br />

Location Policy 6 (LP06) – Development in Chertsey Urban Area<br />

4.47 Chertsey’s urban area has a wide ranging, diverse and complex character containing town centre uses<br />

and large areas of housing, as well as notable areas of commercial and light industrial areas, all of<br />

which contribute to <strong>the</strong> viability and vitality of <strong>the</strong> urban area. The Council has identified eight broad<br />

character areas in Chertsey as follows: <strong>the</strong> historic town centre core, which equates to <strong>the</strong><br />

Conservation Area; a central area of open space; <strong>the</strong> Gogmore Lane commercial/industrial area; <strong>the</strong><br />

<strong>for</strong>mer Chertsey Revitalisation Area in proximity to <strong>the</strong> centre and <strong>the</strong> station; <strong>the</strong> Hanworth Lane<br />

reserve housing site south of <strong>the</strong> railway line; an area of late C19 housing off Station Road; an area of<br />

predominantly post‐war housing to <strong>the</strong> west side of <strong>the</strong> urban area; and an area of housing of mixed<br />

period to <strong>the</strong> east side of <strong>the</strong> urban area.<br />

4.48 Chertsey town centre is, in <strong>the</strong> main, a convenience and service centre. The lack of a significant<br />

comparison goods offer is not in itself a cause <strong>for</strong> concern, as a town’s vitality can be driven by several<br />

factors and a strong service and convenience goods offer can per<strong>for</strong>m this function, so long as <strong>the</strong><br />

needs of <strong>the</strong> town’s catchment in <strong>the</strong>se regards are met. However, although <strong>the</strong> centre is both lively<br />

Page | 55 Runnymede BC FINAL <strong>Sustainability</strong> <strong>Appraisal</strong> <strong>Report</strong> – Feb 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!