Location Policy 1 (LP01) – Strategy <strong>for</strong> <strong>the</strong> Location of Development<br />

4.25 The <strong>Local</strong> <strong>Plan</strong> considered three policy options <strong>for</strong> Policy LP01 to deliver its objective. These have been<br />

summarised in Table 15.<br />

4.26 At <strong>the</strong> heart of <strong>the</strong> National <strong>Plan</strong>ning Policy Framework is a presumption in favour of sustainable<br />

development, which should be seen as a golden thread running through both plan‐making and<br />

decision‐taking. For <strong>the</strong> <strong>Local</strong> <strong>Plan</strong> this means that local planning authorities should positively seek<br />

opportunities to meet <strong>the</strong> development needs of <strong>the</strong>ir area.<br />

4.27 The policies in <strong>the</strong> <strong>Local</strong> <strong>Plan</strong> are underpinned by <strong>the</strong> presumption in favour of sustainable<br />

development so that development which is sustainable can be expedited. The <strong>Local</strong> <strong>Plan</strong> is based upon<br />

and reflects <strong>the</strong> presumption in favour of sustainable development, with clear policies that will guide<br />

how <strong>the</strong> presumption should be applied locally.<br />

4.28 Evidence based material has in<strong>for</strong>med <strong>the</strong> production of <strong>the</strong> <strong>Local</strong> <strong>Plan</strong>. The retail study has<br />

demonstrated <strong>the</strong> opportunities <strong>for</strong> investment within <strong>the</strong> Borough’s town centres to meet future<br />

need. However, <strong>the</strong> housing and employment land reviews that examined <strong>the</strong> future requirements in<br />

<strong>the</strong> Borough concluded that <strong>the</strong> identified requirements cannot be met solely from within existing<br />

urban areas.<br />

Table 15 – LP01 Policy Options Considered<br />

Policy and Alternatives Considered<br />

Assessment<br />

ID.<br />

Policy/Alternative Policy Text<br />

Location Policy 1 (LP01) – Strategy <strong>for</strong> <strong>the</strong> Location of Development<br />

This approach will result in focusing development within <strong>the</strong> existing urban areas with <strong>the</strong><br />

exception of a new centre at DERA.<br />

LP01‐A1 No additional growth but to respond to development schemes as <strong>the</strong>y arise<br />

following <strong>the</strong> guidance in <strong>the</strong> NPPF to permit sustainable development. (This ignores<br />

<strong>the</strong> SCS, excludes DERA <strong>for</strong> housing as it would remain in <strong>the</strong> green belt, but it would<br />

include <strong>the</strong> extant permission <strong>for</strong> commercial development. However, under <strong>the</strong><br />

policy L02 fur<strong>the</strong>r work is required to consider <strong>the</strong> consequences of choosing <strong>the</strong><br />

housing options that require green belt releases)<br />

LP01‐A2 To focus solely on Addlestone <strong>for</strong> promoting significant development using <strong>the</strong> 2012<br />

quanta of developments (that <strong>for</strong>med <strong>the</strong> early work on <strong>the</strong> SCS) and let o<strong>the</strong>r areas<br />

respond to development as option 2. This would exclude DERA <strong>for</strong> housing as it<br />

would remain in <strong>the</strong> green belt, but it would include <strong>the</strong> extant permission <strong>for</strong><br />

commercial development.<br />

4.29 The approach in LP01 directs new development towards previously developed land within <strong>the</strong> existing<br />

urban settlements, to <strong>the</strong> <strong>for</strong>mer DERA site at Longcross, and to meet <strong>the</strong> growth aspirations of Royal<br />

Holloway University of London on <strong>the</strong> main London Road campus. Full consideration will be given to<br />

<strong>the</strong> impact on <strong>the</strong> transport network, to <strong>the</strong> risk of flooding, and to <strong>the</strong> potential impact of residential<br />

development on <strong>the</strong> Thames Basin Heaths Special Protection Area. Proposals will make appropriate<br />

provision <strong>for</strong> af<strong>for</strong>dable housing. Where relevant, consideration will be given to any effect on areas of<br />

nature conservation importance, and on open space and recreational facilities.<br />

4.30 The approach in LP01 – A1 proposes no additional growth but to respond to development schemes as<br />

<strong>the</strong>y arise following <strong>the</strong> guidance in <strong>the</strong> NPPF to permit sustainable development. (This ignores <strong>the</strong> SCS,<br />

excludes DERA <strong>for</strong> housing as it would remain in <strong>the</strong> green belt, but it would include <strong>the</strong> extant<br />

permission <strong>for</strong> commercial development).<br />

4.31 The approach in LP01 – A2 focuses solely on Addlestone <strong>for</strong> promoting significant development using<br />

<strong>the</strong> 2012 quantum’s of developments (that <strong>for</strong>med <strong>the</strong> early work on <strong>the</strong> SCS) and let o<strong>the</strong>r areas<br />

respond to development as option A1. This would exclude DERA <strong>for</strong> housing as it would remain in <strong>the</strong><br />

green belt, but it would include <strong>the</strong> extant permission <strong>for</strong> commercial development and focus solely on<br />

Addlestone <strong>for</strong> major growth.<br />

Page | 52 Runnymede BC FINAL <strong>Sustainability</strong> <strong>Appraisal</strong> <strong>Report</strong> – Feb 2013