Table C-1<br />
Fremont Park-and-Ride Cost Estimate<br />
Bus Shelter 5 ft wide 20 ft long Area (ft 2 ) 100 $150 per ft 2<br />
Area 108 ft wide 135 ft long Area (ft 2 ) 14580<br />
Lighting 4 each $2,000 each<br />
Curb and Gutter 600 ft total length $16 per ft<br />
Asphalt 6 in thick Density 153 lb/ft 3 $45 per ton<br />
Concrete Sidewalk and Pad 200 ft 2 $3 per ft 2<br />
Earthwork 1600 yd 3 $15 per yd 3<br />
Land Acquisition 18225 ft 2 $5 per ft 2<br />
Cost estimate<br />
Fremont Assumptions:<br />
Bus Shelter $15,000 Bus Shelter is a standard shelter without special ro<strong>of</strong>ing<br />
Excavation $24,000 Utility Services supplied by local utility companies<br />
Asphalt $26,000 Asphalt is standard City <strong>of</strong> Omaha or <strong>Nebraska</strong> <strong>Department</strong> <strong>of</strong> <strong>Roads</strong> Mix<br />
Concrete Sidwalk and Pad $600 50 parking stalls, 5 short term stalls, 5 ADA parking stalls<br />
Curb and Gutter $10,000 Approximately 15,000 ft 2 <strong>of</strong> asphalt pavement constructed<br />
Signage $2,000 Land Acquisition based average unit price for ROW acquisition<br />
Ticket Vending Machine (TVM) $65,000<br />
Exterior Lighting $8,000 Assume site soils are suitable for building and parking lot construction<br />
Land Acquisition $92,000 6" Concrete Class 47B-3000 Surfacing<br />
Contingency (30%) $46,000<br />
Engineering (15%) $30,000<br />
Construction (15%) $30,000<br />
$348,600