NTRAC Final Study - Nebraska Department of Roads - State of ...
NTRAC Final Study - Nebraska Department of Roads - State of ...
NTRAC Final Study - Nebraska Department of Roads - State of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
EXISTING CONDITIONS<br />
expressway. Also US-6 is being widened in the 2004-2008 timeframe to a four-lane expressway.<br />
The upgrade information was obtained from the NDOR 2003-2008 Surface Transportation<br />
Program.<br />
Fremont to Norfolk<br />
The primary highway in the corridor between Fremont and Norfolk is US-275. US-275 currently<br />
is four-lane highway between Fremont and Winslow, and a two-lane highway between Winslow<br />
and Norfolk. The four-lane section between Fremont and Winslow was operating at a LOS A,<br />
and the two-lane section between Winslow and Norfolk was operating at a LOS B in the year<br />
2000. The two-lane section is to be upgraded to a four-lane highway in the five-year program<br />
(2004-2008) or the year 2009 or beyond, as stated in NDOR 2003-2008 Surface Transportation<br />
Program. L-128B and US-6 would be part <strong>of</strong> the route as well. L-128B is being upgraded to a 4<br />
lane expressway from Skyline Drive to US-275 in the 2004 to 2009 time frame.<br />
Fremont Norfolk<br />
Omaha<br />
C<br />
Columbus B A<br />
Fremont to Columbus<br />
The primary highway in the corridor between Fremont and Columbus is US-30. US-30 is<br />
primarily a two-lane highway between Fremont and Columbus. The two-lane section between<br />
Fremont and Columbus was operating at a LOS B in the year 2000. The two-lane section is to be<br />
upgraded to a four-lane highway in the five-year program (2004-2008) or the year 2009 or<br />
beyond, as stated in NDOR 2003-2008 Surface Transportation Program.<br />
Columbus to Norfolk<br />
The primary highway in the corridor between Columbus and Norfolk is US-81. US-81 is a fourlane<br />
highway between Columbus and Norfolk. The four-lane section between Columbus and<br />
Norfolk was operating at a LOS A in the year 2000. This section was recently upgraded to a<br />
four-lane highway.<br />
Corridor 3: <strong>Nebraska</strong> City-Omaha-Blair-Sioux City<br />
<strong>Nebraska</strong> Blair Fremont Winnebago<br />
City<br />
Omaha B C C<br />
Tekamah C A<br />
Winslow A B<br />
Sioux City<br />
C<br />
Omaha to <strong>Nebraska</strong> City<br />
The primary highway in the corridor between Omaha and <strong>Nebraska</strong> City is US-75. US-75<br />
currently is a four-lane highway between Omaha and Plattsmouth, and a two-lane highway<br />
between Plattsmouth and <strong>Nebraska</strong> City. Since the four-lane section <strong>of</strong> highway is in the urban<br />
384180<br />
NEBRASKA TRANSIT CORRIDORS STUDY<br />
Page 2 - 16<br />
WILBUR SMITH ASSOCIATES