06.11.2014 Views

NTRAC Final Study - Nebraska Department of Roads - State of ...

NTRAC Final Study - Nebraska Department of Roads - State of ...

NTRAC Final Study - Nebraska Department of Roads - State of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EXISTING CONDITIONS<br />

expressway. Also US-6 is being widened in the 2004-2008 timeframe to a four-lane expressway.<br />

The upgrade information was obtained from the NDOR 2003-2008 Surface Transportation<br />

Program.<br />

Fremont to Norfolk<br />

The primary highway in the corridor between Fremont and Norfolk is US-275. US-275 currently<br />

is four-lane highway between Fremont and Winslow, and a two-lane highway between Winslow<br />

and Norfolk. The four-lane section between Fremont and Winslow was operating at a LOS A,<br />

and the two-lane section between Winslow and Norfolk was operating at a LOS B in the year<br />

2000. The two-lane section is to be upgraded to a four-lane highway in the five-year program<br />

(2004-2008) or the year 2009 or beyond, as stated in NDOR 2003-2008 Surface Transportation<br />

Program. L-128B and US-6 would be part <strong>of</strong> the route as well. L-128B is being upgraded to a 4<br />

lane expressway from Skyline Drive to US-275 in the 2004 to 2009 time frame.<br />

Fremont Norfolk<br />

Omaha<br />

C<br />

Columbus B A<br />

Fremont to Columbus<br />

The primary highway in the corridor between Fremont and Columbus is US-30. US-30 is<br />

primarily a two-lane highway between Fremont and Columbus. The two-lane section between<br />

Fremont and Columbus was operating at a LOS B in the year 2000. The two-lane section is to be<br />

upgraded to a four-lane highway in the five-year program (2004-2008) or the year 2009 or<br />

beyond, as stated in NDOR 2003-2008 Surface Transportation Program.<br />

Columbus to Norfolk<br />

The primary highway in the corridor between Columbus and Norfolk is US-81. US-81 is a fourlane<br />

highway between Columbus and Norfolk. The four-lane section between Columbus and<br />

Norfolk was operating at a LOS A in the year 2000. This section was recently upgraded to a<br />

four-lane highway.<br />

Corridor 3: <strong>Nebraska</strong> City-Omaha-Blair-Sioux City<br />

<strong>Nebraska</strong> Blair Fremont Winnebago<br />

City<br />

Omaha B C C<br />

Tekamah C A<br />

Winslow A B<br />

Sioux City<br />

C<br />

Omaha to <strong>Nebraska</strong> City<br />

The primary highway in the corridor between Omaha and <strong>Nebraska</strong> City is US-75. US-75<br />

currently is a four-lane highway between Omaha and Plattsmouth, and a two-lane highway<br />

between Plattsmouth and <strong>Nebraska</strong> City. Since the four-lane section <strong>of</strong> highway is in the urban<br />

384180<br />

NEBRASKA TRANSIT CORRIDORS STUDY<br />

Page 2 - 16<br />

WILBUR SMITH ASSOCIATES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!