NTRAC Final Study - Nebraska Department of Roads - State of ...
NTRAC Final Study - Nebraska Department of Roads - State of ...
NTRAC Final Study - Nebraska Department of Roads - State of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CHAPTER 4 – TECHNOLOGY OPITONS<br />
SUMMARY OF COMPARISONS<br />
Table 4-3: Characteristics <strong>of</strong> Transit Modes<br />
Transit Mode Commuter Rail Intercity Rail Express Bus LRT BRT<br />
ROW options<br />
Exclusive ROW<br />
General railroad<br />
Mixed traffic<br />
Exclusive<br />
ROW<br />
General<br />
railroad<br />
Mixed traffic<br />
Mixed traffic<br />
Exclusive<br />
ROW<br />
Semiexclusive<br />
Mixed traffic<br />
lanes<br />
Exclusive<br />
ROW<br />
Semi-exclusive<br />
Mixed traffic<br />
lanes<br />
Station<br />
spacing<br />
Vehicles<br />
Seated<br />
Capacity<br />
Average<br />
speed<br />
Passenger<br />
throughput<br />
Capital ROW<br />
Cost per mile<br />
Cost per<br />
vehicle<br />
O&M Cost<br />
Per service<br />
hour<br />
5 to 10 miles 100 miles 1 to 5 miles ½ to 1 mile ¼ to 1 mile<br />
Locomotive with<br />
train <strong>of</strong> sets <strong>of</strong><br />
passenger<br />
coaches either<br />
single level or<br />
bi-level; or selfpropelled<br />
multiple units,<br />
either diesel<br />
(DMU) or<br />
electric (EMU).<br />
Locomotive<br />
with passenger<br />
coaches, café<br />
car.<br />
Motor coach, high<br />
platform, diesel,<br />
CNG<br />
85 -150 per car 60-80 per car 45 to 55 per<br />
vehicle<br />
Articulated<br />
and double<br />
articulated low<br />
floor, can<br />
operate in<br />
multiple unit<br />
train sets,<br />
overhead<br />
electric power;<br />
diesel/hybrid<br />
DMU.<br />
Standard,<br />
articulated or<br />
double<br />
articulated<br />
buses, low<br />
floor or high<br />
platform,<br />
diesel,<br />
diesel/hybrid<br />
propulsion or<br />
ETB.<br />
65-85 per car 40 standard<br />
65 articulated<br />
85 double<br />
articulated<br />
25 to 45 mph 65 mph 25 to 45 mph 15 to 30 mph 15 to 30 mph<br />
Up to 6,000<br />
pphpd<br />
Up to 6,000<br />
pphpd<br />
Up to 7,200<br />
pphpd<br />
$2 to 10 million $2 to 10 million $350 k to $25<br />
million<br />
Locomotive Locomotive $350,000 to<br />
$3.0 million; bilevel<br />
$3.0 million; $450,000<br />
coach $1.5 passenger<br />
million; DMU coaches $1.5<br />
$6.8 million for to $2.0 million<br />
a 3-car unit,<br />
Colorado<br />
Railcar<br />
Up to 20,000<br />
pphpd<br />
$20 to 55<br />
million<br />
$1.8 to $3.0<br />
million<br />
Up to 20,000<br />
pphpd<br />
$250 k to $25<br />
million<br />
$350,000 to<br />
$1.8 million<br />
$300 to $400 $175 to $250 $75 to $100 $150 to $200 $65 to $100<br />
Source: Vukan R. Vuchic; Urban Public Transportation; Systems and Technology; Prentice-Hall, Englewood Cliffs New Jersey,<br />
1981 and Wilbur Smith Associates.<br />
384180<br />
NEBRASKA TRANSIT CORRIDORS STUDY<br />
Page 4 - 12<br />
WILBUR SMITH ASSOCIATES