01.12.2014 Views

DSLBD Office Fit Out - Broughton Construction Company

DSLBD Office Fit Out - Broughton Construction Company

DSLBD Office Fit Out - Broughton Construction Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Shop Applied Finishes: Catalyzed polyurethane AWI 1500<br />

1. Quality Grade: Premium<br />

3. Transparent Finish: AWI System #TR-6<br />

a. Color: Stain to match control sample provided by Architect<br />

b. Sheen (60° gloss meter): Satin; 32° - 36° ASTM D523<br />

c. Effect: Partially filled pore<br />

d. An ultraviolet sun-screening agent shall be added to finish coat to inhibit discoloration<br />

and darkening of mahogany and cherry veneers.<br />

4. Opaque Finish: AWI System #OP-6<br />

a. Color: Match color selected by Architect; refer to Appendix A - Schedule of Finishes<br />

b. Sheen (60° gloss meter): 60 Semi-gloss; 55° - 75° ASTM D523<br />

c. Effect: Partially filled pore<br />

2.07 SOURCE QUALITY CONTROL<br />

A. Fabrication Tolerances:<br />

1. Size:<br />

a. Thickness: ±1/16”<br />

b. Length: ±1/16”<br />

c. Standard Widths: ±1/16”<br />

d. Pre-fit Widths: ±1/32”<br />

2. Factory Hardware Preparation: Comply with tolerances indicated on hardware templates.<br />

3. Warp shall be measured as a distortion in door itself, and shall not refer to door in relation to frame<br />

or jamb in which it is hung. Warp shall not exceed 1/4” in plane of door itself.<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

A. Site Verification of Conditions<br />

1. Examine frames and other conditions under which installation of wood doors is to be performed.<br />

2. Correct conditions detrimental to timely and proper hanging of doors.<br />

3. Do not proceed until unsatisfactory conditions have been corrected.<br />

4. Commencement of installation constitutes acceptance of conditions and responsibility for<br />

satisfactory performance.<br />

3.02 INSTALLATION<br />

A. General Requirements:<br />

1. Install fire-rated doors in corresponding fire-rated frame in compliance with NFPA No. 80 and 101.<br />

a. Preparation of 20, 45, 60, and 90 minute doors shall be done under label service in<br />

compliance with manufacturer’s service procedure. This includes trimming for size,<br />

except a maximum of 3/4” off bottom of door.<br />

b. Preparation for locks, latches, hinges, closers, lights, louvers, astragal, and any<br />

fabrication shall be done under licensed label service.<br />

2. Hang doors to operate freely, but not loosely, and free from rattling when in latched position. Doors<br />

shall be free from hinge bound conditions, sticking or binding with hardware properly adjusted and<br />

in functioning order.<br />

3. Align doors to frame for proper fit and uniform clearance. <strong>Fit</strong> doors tightly against stops. Doors<br />

that are warped, twisted, or which are not in true plane shall be removed and replaced at no<br />

additional cost to Owner.<br />

4. Trim doors width by cutting equally on both jamb edges. Seal cut surfaces after fitting and<br />

machining.<br />

WOOD DOORS 08 14 00-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!