OJS Building Rules and Regulations<br />

<br />

<br />

Passenger elevators are not to be used to haul or transport materials and goods. The freight elevators<br />

located on the north and south side can be used for this purpose and subject to availability. Use of the<br />

freight elevator must be pre-arranged with the Building Management office, 202-727-3133.<br />

OJS has a restrictive key way system and the bitting must be maintained. DGS FD will provide a letter of<br />

authorization for the purchase of locks, cores, key blanks and/or keys by the contractor. Please contact the<br />

Building Manager to request authorization, 202-727-2585.<br />

o<br />

o<br />

o<br />

o<br />

DGS <strong>Construction</strong>:The cost to key the newly constructed offices to OJS’ key way system must be<br />

included in <strong>Construction</strong> costs.<br />

Contractor shall be responsible to install a lock box and populate that with keys with distinct door<br />

numbers so that it is easy to identify all keys of the entire suit. Contractor must consider this cost in<br />

their pricing.<br />

All door locks shall be Schlage, Commercial grade to match building standard. GC shall provide<br />

Master Keying to match building Masters.<br />

All Door Hardware shall match building standard<br />

<br />

During the demolition work the contractor must:<br />

o<br />

o<br />

o<br />

o<br />

o<br />

Protect the area within their scope so that dust does not enter in vicinity suites;<br />

Demolition work must be conducted during close of business hours;<br />

If required by the drawings, installation, relocation, and programming of any VAV boxes shall be<br />

coordinated with the Building Engineer in order to stay compatible with the existing Building<br />

Management System. Please see mechanical details for more clarification. EASI Controls has<br />

programmed all VAV boxes in the building. EASI can be reached at 877-538-3274.<br />

All work that requires tie-in to building systems must be pre-arranged with the Building Manager<br />

and Building Engineer (202-727-2585). Once installed, the work must be approved by DCRA<br />

and/or their designee with a signed copy of the Certificate of Occupancy provided to the Building<br />

Manager.<br />

The Contractor shall keep the air handling units filters clean during construction. Fixing all<br />

damages to the air handling units due to dust will be the responsibility of the Contractor. Upon<br />

Substantial completion, the contractor shall install new filters for the air handling units servicing the<br />

construction area.<br />

<br />

It will be the responsibility of the contractor to conduct all due diligence before proceeding with such work.<br />

That includes,<br />

o<br />

o<br />

o<br />

o<br />

o<br />

At a minimum, x-ray/GPR of the affected area before conducting drilling/channeling work;<br />

All types of x-ray/GPR work must be performed outside of business hours;<br />

Schedule the x-ray/GPF work with the Facility Engineer by providing notices at least 72 hours<br />

before the actual work;<br />

Result of x-ray/GPR must be provide to the AE with a copy to the Project Manager and get<br />

approval before conducting the actual work;<br />

Core Drilling/Channeling work must be performed outside of business hours.<br />

END<br />