OJS Building Rules, Regulations, and Requirements<br />

One Judiciary Square<br />

441 4 th Street NW<br />

Washington, DC 20001<br />

The General Contractor shall be responsible for compliance with the Building Rules, Regulations, and Requirements as<br />

outlined below, and shall include and be responsible for all costs that are indicated below as costs to DGS within the<br />

Cost of the Tenant build-out of suites for offices of <strong>DSLBD</strong>.<br />

Scheduled use of the loading dock requires at least 72 hours and is subject to availability, Mon – Fri, 7am –<br />

5:30pm (business hours) and 5:30pm -11pm (by special request to Building Management office, 202-727-<br />

3133).<br />

o<br />

DGS <strong>Construction</strong>: If anyone requires use of the dock outside of that time frame, it will require<br />

overtime engineer coverage at a rate of $81.51 per hour and would have to be arranged 72 hours in<br />

advance. Prospective bidders should include this cost in their bid price.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

All construction materials and goods must be removed by the contractor to include but not limited to large<br />

packing boxes, crates, pallets, debris, unwanted items, etc. Please do not leave any materials, debris or<br />

unwanted items on the loading dock. All construction debris must be removed daily.<br />

The loading dock is to be used for the transfer and delivery of goods and materials only. No space for use a<br />

dumpster is available. Long term parking on the dock is not permitted unless arranged and approved by the<br />

Building Management office, 202-727-3133.<br />

Work may be performed 24 hours a day. All work that could create a noise disturbance to tenants must be<br />

performed during non-business hours, Mon-Fri after 5:30pm and weekends (subject to review). Prospective<br />

bidders should include such cost in their bid price.<br />

It is the responsibility of the Contractor to review all necessary drawings and send RFI, if they find that<br />

installation of any drywall of other accessories will limit the maintenance of any existing or newly installed<br />

equipment. All equipment in the area must have clear maintenance access.<br />

All carpet in the general area must be covered by heavy duty paper of plastic so that the carpet is not<br />

damaged or soiled. In the event it becomes damaged as judged by the Owner or Architect, it will be the<br />

responsibility of the Contractor to replace carpet of that area matching the existing carpet.<br />

During the pre-construction meeting or sooner, the OJS Chief Building Engineer and/or his designee, and<br />

the Building Manager will review the approved plans to ensure they are in accordance with the Building<br />

standards and do not impact building systems. Upon review and approval, a sign off by the Chief Building<br />

Engineer will be provided.<br />

All work that requires tie-in to building systems must be pre-arranged with the Building Manager and Building<br />

Engineer, 202-727-2585. Once installed, the work must be approved by DCRA and/or their designee with a<br />

signed copy of the Certificate of Occupancy provided to the Building Manager.<br />

o DGS <strong>Construction</strong>: Any requests to tie-in Fire, Sprinkler and related Building Emergency<br />

Notification systems must be contracted directly with the Building’s fire alarm and sprinkler systems<br />

contractors, Siemens and/or Guardian. This is not a Facilities/Building Management cost.All new<br />

systems installation shall be synchronized with existing systems.<br />

OPX – Project No. 3191 Building Rules, Regs, Requirements -1 of 2 05.08.13