B. Match tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and<br />

packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles.<br />

1. Lay tiles in pattern of colors and sizes indicated in drawings.<br />

C. Static-Control Tiles: In each space where conductive solid vinyl floor tile is installed, install maintenance tile<br />

identifying conductive floor tile in location approved by Architect.<br />

3.5 SHEET FLOOR COVERINGS INSTALLATION<br />

A. Unroll sheet floor coverings and allow them to stabilize before cutting and fitting.<br />

B. Lay out sheet floor coverings as follows:<br />

1. Maintain uniformity of floor covering direction.<br />

2. Minimize number of seams; place seams in inconspicuous and low-traffic areas, at least 6 inches (152 mm)<br />

away from parallel joints in floor covering substrates.<br />

3. Match edges of floor coverings for color shading at seams.<br />

4. Avoid cross seams.<br />

C. Seamless Installation:<br />

1. Heat-Welded Seams: Comply with ASTM F 1516. Rout joints and heat weld with welding bead to<br />

permanently fuse sections into a seamless floor covering. Prepare, weld, and finish seams to produce<br />

surfaces flush with adjoining floor covering surfaces.<br />

2. Chemically Bonded Seams: Bond seams with chemical-bonding compound to permanently fuse sections<br />

into a seamless floor covering. Prepare seams and apply compound to produce tightly fitted seams without<br />

gaps, overlays, or excess bonding compound on floor covering surfaces.<br />

D. Integral Flash Cove Base: Cove floor coverings 6 inches (152 mm) up vertical surfaces. Support floor coverings at<br />

horizontal and vertical junction with cove strip. Butt at top against cap strip.<br />

3.6 RESILIENT WALL BASE INSTALLATION<br />

A. Apply wall base to walls, columns, pilasters, and other permanent fixtures in rooms and areas where base is required<br />

in drawings.<br />

B. Install wall base in lengths as long as practicable without gaps at seams and with tops of adjacent pieces aligned.<br />

C. Tightly adhere wall base to substrate throughout length of each piece, with base in continuous contact with horizontal<br />

and vertical substrates.<br />

D. Do not stretch wall base during installation.<br />

E. On masonry surfaces or other similar irregular substrates, fill voids along top edge of wall base with manufacturer's<br />

recommended adhesive filler material.<br />

F. Premolded Corners: Install premolded corners before installing straight pieces.<br />

G. Job-Formed Corners:<br />

1. <strong>Out</strong>side Corners: Use straight pieces of maximum lengths possible. Form without producing discoloration<br />

(whitening) at bends. Shave back of base at points where bends occur and remove strips perpendicular to<br />

length of base that are only deep enough to produce a snug fit without removing more than half the wall base<br />

thickness.<br />

RESILIENT FLOORING 09 65 00 - 9