- Page 1:
PROJECT MANUAL DSLBD Offices D G S
- Page 4 and 5:
TABLE OF CONTENTS Section 09 68 13
- Page 6 and 7:
A. General: Contractor shall have f
- Page 8 and 9:
4. Applications containing requests
- Page 10 and 11:
i) Product, model and finish ii) Ac
- Page 12 and 13:
2. Include a list of quantities of
- Page 14 and 15:
3. Installation and removal of temp
- Page 16 and 17:
PART 2 - PRODUCTS (Not Used) PART 3
- Page 18 and 19:
G. Fragnet: A partial or fragmentar
- Page 20 and 21:
D. Constraints: Include constraints
- Page 22 and 23:
5. Changes in the critical path. 6.
- Page 25 and 26:
SECTION 01 33 00 - SUBMITTAL PROCED
- Page 27 and 28:
3. Resubmit submittals until they a
- Page 29 and 30:
A. General: Prepare and submit Info
- Page 31 and 32:
SECTION 01 35 16 - ALTERATION PROJE
- Page 33 and 34:
3.03 REPAIR/RESTORATION 2. Remove u
- Page 35 and 36:
SECTION 01 40 00 - QUALITY REQUIREM
- Page 37 and 38:
3. Name, address, and telephone num
- Page 39 and 40:
3. Where quality-control services a
- Page 41 and 42:
SECTION 01 42 00 - REFERENCES PART
- Page 43 and 44:
addresses are subject to change and
- Page 45 and 46:
(American Society for Testing and M
- Page 47 and 48:
FCI Fluid Controls Institute (216)
- Page 49 and 50:
www.maplefloor.org MFMA Metal Frami
- Page 51 and 52:
www.opl.com (210) 635-8100 PCI Prec
- Page 53 and 54:
www.ul.com (847) 272-8800 UNI Uni-B
- Page 55:
(See TRB) NIST National Institute o
- Page 58 and 59:
2.2 EQUIPMENT 1. Heating Equipment:
- Page 60 and 61:
C. Temporary Facility Changeover: D
- Page 62 and 63:
4. Completed List: Within 60 days a
- Page 64 and 65:
A. General Product Requirements: Pr
- Page 66 and 67:
c. List of unacceptable installatio
- Page 68 and 69:
A. General: Clean Project site and
- Page 71 and 72:
SECTION 01 74 19 - CONSTRUCTION WAS
- Page 73 and 74:
D. Site Access and Temporary Contro
- Page 75 and 76:
SECTION 01 77 00 - CLOSEOUT PROCEDU
- Page 77 and 78:
1. Bind warranties and bonds in hea
- Page 79 and 80:
SECTION 01 78 23 - OPERATION AND MA
- Page 81 and 82:
a. If two or more binders are neces
- Page 83 and 84:
C. Product Information: Include the
- Page 85:
2. Comply with requirements of newl
- Page 88 and 89:
5. Locations of proposed dust- and
- Page 90 and 91:
B. Temporary Facilities: Provide te
- Page 93 and 94: SECTION 06 10 00 - ROUGH CARPENTRY
- Page 95 and 96: SECTION 06 40 00 - ARCHITECTURAL WO
- Page 97 and 98: 1.8 COORDINATION A. Coordinate size
- Page 99 and 100: D. Complete fabrication, including
- Page 101: C. Clean woodwork on exposed and se
- Page 104 and 105: 1.4 SUBMITTALS A. Product Data: For
- Page 106 and 107: c. Fire-rated form board. d. Filler
- Page 108 and 109: 1. Fill voids and cavities formed b
- Page 110 and 111: F. Warranties: Special warranties s
- Page 112 and 113: 2. Type and Grade: M (multicomponen
- Page 114 and 115: e. Wood 3. Remove laitance and form
- Page 117 and 118: SECTION 08 12 16 - ALUMINUM FRAMES
- Page 119: A. Examine walls, floors, and ceili
- Page 122 and 123: 1.04 SUBMITTALS 2. BLENDING - Color
- Page 124 and 125: a. Americans with Disabilities Act
- Page 126 and 127: 2. Doors may, at Contractor’s opt
- Page 128 and 129: B. Shop Applied Finishes: Catalyzed
- Page 131 and 132: SECTION 08 42 26 - ALL-GLASS ENTRAN
- Page 133 and 134: 5. Pilkington 6. Tempglass 7. Virgi
- Page 135: 3.04 CLEANING 2. Use a method of at
- Page 138 and 139: 2. McKinney 3. Stanley Works B. Piv
- Page 140 and 141: 3.02 INSTALLATION 1. Examine doors,
- Page 142 and 143: a. 5 year warranty period b. Warran
- Page 146 and 147: C. Sound Transmission Characteristi
- Page 148 and 149: . Depth: As indicated. 3. Hat-Shape
- Page 150 and 151: B. Facing: FSK (foil/scrim/kraft).
- Page 152 and 153: C. Isolate steel framing from build
- Page 154 and 155: D. Integrate stair hanger rods with
- Page 156 and 157: 2. Wet gypsum panels on surfaces th
- Page 158 and 159: 1.5 QUALITY ASSURANCE A. Qualificat
- Page 160 and 161: 4. Elastomeric Sealants: a. Dow Cor
- Page 162 and 163: 1. Products: a. Boiardi Products Co
- Page 164 and 165: B. Metal Edge Strips: Angle or L-sh
- Page 166 and 167: D. Accurately form intersections an
- Page 168 and 169: 1. Remove epoxy and latex-portland
- Page 171 and 172: SECTION 09 51 00 - ACOUSTICAL CEILI
- Page 173 and 174: SECTION 09 65 00 - RESILIENT FLOORI
- Page 175 and 176: B. Manufacturers: 1. Solid Vinyl Fl
- Page 177 and 178: B. Class: As indicated by product d
- Page 179 and 180: A. Description: As indicated in App
- Page 181 and 182: B. Match tiles for color and patter
- Page 183 and 184: SECTION 09 68 13 - CARPET TILING PA
- Page 185 and 186: 3. Provide a written warranty cover
- Page 187: D. Clean metal substrates of grease
- Page 190 and 191: PART 2 - PRODUCTS 2.01 SELECTIONS A
- Page 192 and 193: 1. Number of coats specified are mi
- Page 195 and 196:
SECTION 11 31 00 - RESIDENTIAL APPL
- Page 197 and 198:
DGS OJS DSLBD ONE JUDICIARY SQUARE,
- Page 199 and 200:
A. Resilient Base Selections: 1. Dr
- Page 201 and 202:
DGSOJS DSLBD ONE JUDICIARY SQUARE,
- Page 203 and 204:
OJS Building Rules, Regulations, an