3.02 INSTALLATION<br />

A. Coordinate with other trades to assure proper and adequate provisions are made for interface with this<br />

portion of Work.<br />

B. Install appliances in strict accordance with manufacturer's recommendations. Anchor components firmly into<br />

position in proper relation to work surfaces, floors, etc.<br />

3.04 ADJUSTING<br />

A. Touch-up scratches and abrasions to be completely invisible to unaided eye from a distance of 5 feet.<br />

B. Upon completion of installation and hook-up to utilities, put operating components of appliances through at<br />

least 5 complete operating cycles, adjusting as necessary to secure optimum level of operation.<br />

3.05 CLEANING<br />

A. Promptly remove from Site, cartons and packing material associated with work of this section.<br />

END OF SECTION 11 31 00<br />

RESIDENTIAL APPLIANCES 11 31 00-2