01.12.2014 Views

DSLBD Office Fit Out - Broughton Construction Company

DSLBD Office Fit Out - Broughton Construction Company

DSLBD Office Fit Out - Broughton Construction Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 08 80 00 - GLAZING<br />

PART 1 - GENERAL<br />

1.01 SUMMARY<br />

A. Work Included: Glass and Decorative Films as shown on the drawings<br />

1.02 SUBMITTALS<br />

A. Product Data:<br />

1. Submit manufacturer's literature describing products to be provided.<br />

B. Samples:<br />

1. Submit 2 samples of each type of glass other than clear glass; sample size shall be 12" x 12".<br />

1.03 QUALITY ASSURANCE<br />

A. Qualifications:<br />

1. Installer shall be a firm with not less than 5 years successful experience in glazing work similar to<br />

required work.<br />

1. When a manufacturer is not indicated, provide products from a company specializing in<br />

manufacture of glass and glazing products with a minimum of 5 years experience.<br />

2. Installer shall be trained in installation techniques and procedures of glass and glazing products<br />

and shall demonstrate a minimum of 3 years successful experience in such installation. Installer<br />

shall employ, on Project, mechanics with a minimum of 2 years documented experience.<br />

B. Regulatory Requirements:<br />

1. Comply with recommendations and requirements of following:<br />

a. FGMA Architect's Guide to Glass, Metal, and Glazing<br />

b. FGMA Glazing Manual<br />

c. FGMA - Sealant Manual<br />

d. LSGA - Standards Manual<br />

2. Safety Glazing Materials:<br />

a. Provide glazing at Hazardous Locations as determined by CPSC 16 CFR 1201. Glazing<br />

shall be in accordance with Consumer Product Safety Act and shall have been tested<br />

and labeled.<br />

b. Safety glazing shall conform to requirements of ANSI Z97.1.<br />

1.04 PROJECT CONDITIONS<br />

A. Field Measurements:<br />

1. Verify field dimensions prior to fabrication. Manufacturer shall be responsible for details and<br />

dimensions not controlled by job conditions and shall indicate all required field measurements<br />

beyond his control. Contractor and manufacturer shall cooperate to establish and maintain these<br />

field dimensions.<br />

1.05 WARRANTY<br />

A. Upon notification of defects, within warranty period, replace glass and glazing at no additional cost to Owner.<br />

B. Provide written warranties as follows:<br />

1. Laminated and Tempered Safety Glass:<br />

GLAZING 08 80 00-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!