01.12.2014 Views

DSLBD Office Fit Out - Broughton Construction Company

DSLBD Office Fit Out - Broughton Construction Company

DSLBD Office Fit Out - Broughton Construction Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

i. Replace parts subject to unusual operating conditions.<br />

j. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water<br />

exposure.<br />

k. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers,<br />

registers, and grills.<br />

l. Clean ducts, blowers, and coils if units were operated without filters during construction.<br />

m. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out<br />

bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent<br />

and mercury vapor fixtures to comply with requirements for new fixtures.<br />

n. Leave Project clean and ready for occupancy.<br />

C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on<br />

Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste<br />

materials from Project site and dispose of lawfully.<br />

END OF SECTION 01 77 00<br />

CLOSEOUT PROCEDURES 01 77 00 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!