3.04 CLEANING<br />
2. Use a method of attachment to structure to permit sufficient adjustment to accommodate<br />
construction tolerances and irregularities.<br />
3. Provide alignment attachments and shims as required to fasten system to building structure.<br />
4. <strong>Fit</strong>, align, and adjust door assemblies plumb and level, to provide a smooth operation.<br />
5. Clearances:<br />
a. Door Head and Jambs: 1/8"<br />
b. Door Sills: 1/4"<br />
c. Butt Glazing Joints: 3/8", except between sidelights and all-glass transoms, which shall<br />
be 1/8"<br />
6. Installation of all glass entrance system shall be capable of withstanding impact from operation<br />
(doors), without failure, including loss or breakage of glass.<br />
A. Remove nonpermanent labels from glass surfaces.<br />
B. Wash and polish glass on both faces not more than 4 days prior to substantial completion. Comply with<br />
glass product manufacturer's recommendations for final cleaning.<br />
3.05 PROTECTION<br />
A. Remove and replace glass which is broken, chipped, cracked, abraded or damaged.<br />
B. Protect glass from breakage immediately upon installation, by use of crossed streamers attached to framing<br />
and held away from glass. Do not apply markers to surfaces of glass.<br />
END OF SECTION 08 42 26<br />
ALL-GLASS ENTRANCES 08 42 26-5