WHEREAS - Watsonville California
WHEREAS - Watsonville California
WHEREAS - Watsonville California
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DISCUSSION: The Auto Center Drive Pedestrian Improvements shall<br />
enhance pedestrian safety by installing a crosswalk and pedestrian<br />
improvements across Auto Center Drive at the intersection with Main<br />
Street/State Route 152. Improvements include reconstruction of a<br />
portion of Auto Center Drive, replacement of curb, gutter and sidewalk,<br />
modifications to the existing traffic signal and restriping of the roadway.<br />
On April 14, 2009, the City Council approved Resolution No. 58-09<br />
(CM) that included approval of plans and specifications and called for<br />
bids for the subject project. Bids for the project were opened on May<br />
21, 2009. A summary of the bids are as follows:<br />
Bidder<br />
Amount<br />
Don Chapin Company, Salinas $109,960.00<br />
Joseph J. Albanese, Inc., Santa Clara $116,245.00<br />
Monterey Peninsula Engineering, Inc., Monterey $117,400.00<br />
Granite Construction Company, <strong>Watsonville</strong> $138,145.00<br />
JJR Construction, Inc., San Mateo $147,627.00<br />
Granite Rock Company,<br />
Pavex Construction Division, San Jose $159,891.00<br />
Earthworks Paving Contractors, Inc., Capitola $184,183.00<br />
STRATEGIC PLAN: This project is a part of the improvements<br />
described within the <strong>Watsonville</strong> City Council’s 2007-2009 Strategic<br />
Plan Goal I, Sustainable Economic Development, #12 – Construction<br />
of Auto Center Drive Improvements.<br />
FINANCIAL IMPACT: Award of the project to the Don Chapin<br />
Company is in the amount of $109,960.00. The project is being funded<br />
with $110,000 from Caltrans Cooperative Agreement 05-CA-0216,<br />
approved by City Council in Resolution No 102-08 (CM) on June 24,<br />
2008. Any additional project costs shall be from Gas Tax funds.<br />
Page 2 of 3<br />
Murray Fontes 5/20/2009 11:44:49 AM<br />
M:\Public Works & Utilities\Staff Reports\2009\maf auto center drive pedestrian improvements 05.26.09a.docx