Michelle Beck - Palomar College
Michelle Beck - Palomar College
Michelle Beck - Palomar College
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 2<br />
INVIVO – PHILIPS HEALTHCARE, Orlando, FL, USA Nov 2006 – Jan 2008<br />
Philips Integration Project Manager<br />
� Led a cross-functional operations integration team between Philips Healthcare and Invivo, a US $40M MR Patient Monitoring<br />
Business.<br />
� Established project methodology, communication, and issue resolution processes. Ensured workstream alignment with integration<br />
goals, project plans, cross-team interdependencies, and overall schedule. The project was successfully completed and strategies<br />
were leveraged in subsequent integration projects.<br />
Production Engineering Manager<br />
� Managed the Sustaining Engineering, Manufacturing/Process Engineering, and Facilities departments (12 direct reports).<br />
Responsible for a US $3.5M budget.<br />
INVIVO – INTERMAGNETICS, Orlando, FL, USA Sep 2005 – Nov 2006<br />
Special Projects, Lean Project Manager<br />
� Converted a 45K sq. ft. warehouse into a US $50M Medical Device Manufacturing facility with operational excellence<br />
supporting processes. Managed a US $1M budget, completing the project under budget and on-time, within a six month time<br />
frame.<br />
� Reengineered a wrist coil production line which reduced production lead time from 22 days to 5 days, reduced manufacturing<br />
standard hours per unit from 31 hrs on average to 10 hrs, increased annual turns from 2 to 10, reduced labor requirements from 5<br />
to 3, trained and empowered production technicians to identify waste and propose projects for continuous improvement.<br />
� Launched a project transferring the service and repair operations from Pewaukee, WI to Gainesville, FL.<br />
STRATEGY 3 INC, Dayton, OH, USA (Strategic partnership with the George Group - Accenture) Jan 2004 – Sep 2005<br />
Lead ImpleMentor – Engineer (Consulting and Implementation)<br />
� Provided Lean Manufacturing consulting for 7 customers with operations in connectors and harnesses, marine pumps and<br />
accessories, food manufacturer, powder coating, color fusion, metal pressing, screen printing, stamping and welding.<br />
KEY ACCOUNT:<br />
ITT CANNON INDUSTRIES VEAM, Milano, Italy<br />
A US $47M connector and harness business acquired in 2003, with a production backlog of approximately €1.5M<br />
• Launched a company-wide operational improvement project reengineering all manufacturing processes, reducing production<br />
lead time from 22 days to 1.5 days, and overall backlog reduction of €250K.<br />
• Supported a full ERP implementation, training over 100 manufacturing employees in Lean Manufacturing concepts and<br />
principles.<br />
ADDITIONAL<br />
CONTINUOUS EDUCATION<br />
PHILIPS ELECTRONICS<br />
Six Sigma Black Belt Training Certification 2008<br />
UNIVERSITY OF MICHIGAN<br />
Six Sigma Green Belt Certification 2007 - 2008<br />
DEVELOPMENT PROGRAMS<br />
• Philips High Potential Since 2009<br />
• Philips ORION – 6 Month Leadership Development Program 2008<br />
• Philips TRIM Facilitator Certificate 2008<br />
SKILLS AND OTHERS<br />
Other Interests ▪ Studying languages, golfing, running, overall fitness and photography<br />
Active Non Profit ▪ Alegria de rua (São Paulo, Brazil)<br />
Professional Groups ▪ Fórum sobre Integração de Empresas (São Paulo, Brazil)<br />
Internships ▪ Delphi Automotives; Co-op Program (Dayton, Ohio) ▪ 3 Semesters between 2001-2003