11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 3-7Level 5 Screening Step 3 - Alternatives B3 South and B4: Summary of Key Impacts and CostsAlternative B3 SouthAlternative B4<strong>Program</strong> Element (2020) (Runway 5-23 8,300 feet) (Runway 5-23 8,700 feet)Business ImpactsImpacts to Businesses and Jobs 10 businesses and their associated 65 jobs 10 businesses and their associated 65 jobsResidential ImpactsResidential Land Acquisition (Mandatory due to Construction) 11 units 11 unitsNoise ImpactsExposed to Significant Noise Levels in 2020 (increase of 24 people, 10 units 47 people, 20 unitsat least DNL 1.5 dB at or above DNL 65 dB) 1Exposed to Noise Greater than DNL 70 dB in 2020 2 235 people, 100 units 263 people, 112 unitsExposed to Noise Between DNL 65 dB and 70 dB in 2020 2 4,862 people, 2,069 units 4,984 people, 2,121 unitsWetland Impacts 3 7.3 acres in one wetland system, no impacts 7.3 acres in one wetland system, noto Buckeye Brookimpacts to Buckeye BrookFloodplain Impacts 4.7 acres 4.7 acresSection 4(f) Resources 4Winslow Field Recreation FacilitiesHistoric Resources ImpactsRPZ impacts four full-sized softball fields, RPZ impacts four full-sized softball fields,clubhouse, two parking lots, soccer fields, clubhouse, two parking lots, soccer fields,and one playground; 3.4 acres of City land; and one playground;10.5 acres of RIAC land 2.7 acres of City land;10.6 acres of RIAC landHangar No. 1 5 Demolish for safety Demolish for safetyHangar No. 2 (Setting) 5 Internal reconfiguration, no adverse effect Internal reconfiguration, no adverse effectand de minimis useand de minimis useRhode Island State <strong>Airport</strong> Terminal Reduction in views, direct impact to Reduction in views, direct impact to(Setting and Landscaping) 6 landscaping landscapingEligible <strong>Airport</strong> Historic District 5 Alter historical configuration of airfield and Alter historical configuration of airfield andremove Hangar No. 1 remove Hangar No. 1Construction and Preliminary Mitigation Costs 7 $471 million $475 millionNotes: This table summarizes the key differences between Alternatives B4 and B3 South using the 2004 DEIS forecast.1 Properties would be eligible for sound insulation. The analysis is based on the DEIS Level 5 aircraft operations and fleet mix, using INM Version 6.0. Some homesexposed to noise levels DNL 65 dB and above may have already received sound insulation treatment under the NCP. Refer to Figure 3-8.2 Properties would be eligible for acquisition under a voluntary land acquisition program. Does not include neighborhood rounding of noise contours identifyingeligible parcels.3 Wetland impacts are associated with the Runway 34 RSA enhancements.4 Refer to Figure 3-9.5 Eligible for listing on the National Register of Historic Places.6 Listed on the National Register of Historic Places.7 Construction costs for Alternative B3 South are less than Alternative B4 due to a shorter runway extension. Mitigation costs would be slightly less due to fewerresidential units to be acquired and sound insulated.Chapter 3 – Alternatives Analysis 3-28 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH03_Alternatives_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!