11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 5-104Alternative B4: Summary of Impacts to Wetland Functions and Values<strong>Program</strong> Wetland Wetland Wetland GWR/D- S/T/P R- NR/R/T- WLH- VQ/A-Element ID Impact (ac) Area (ac) SWGW FFA WQ WQ PE S&S S F&SH WWH T&E SH REC U/H-AES AESRunway 34 A6 1.5 3.1 XA8 0.1 16.3 X P P X XA10 0 25.6 X P P X X P P X XA11 0.6 2.7 XA13 2.8 19.4 P P P XP Principal Wetland Function or Value. F&S H Fish and Shellfish Habitat.X Additional Wetland Function or Value likely provided by wetland. WLH Wildlife Habitat.GWR/D Groundwater Recharge/Discharge. WWH Wildlife and Wildlife Habitat.SWGW Surface Water and Groundwater.FFA Floodflow Alteration. REC Recreation.S/T/P R Sediment/Toxicant/Pathogen Retention. ED/SV Educational/Scientific Value.NR/R/T Nutrient Removal/Retention/Transformation. U/H Uniqueness/Heritage.WQ Water Quality. AES Aesthetic.T&E SH Threatened and Endangered Species Habitat.PE Production Export. VQ/A Visual Quality/Aesthetics.S&S S Sediment and Shoreline Stabilization.Table 5-105Alternative B4: Wetland Impacts by <strong>Program</strong> Element (acres)Wetland ID A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 I P TotalWetland Size 3.1 7.6 12.9 4.4 14.5 3.1 85.6 16.3 0.5 25.6 2.7 3.5 19.4 15.3 17.1 231.6<strong>Program</strong> ElementRunway 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Runway 34 0 0 0 0 0 1.5 0 0.1 0 0 0.6 0 2.8 0 0 5.0Runway 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Runway 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Partially Relocated 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<strong>Airport</strong> RoadTotal 0 0 0 0 0 1.5 0 0.1 0 0 0.6 0 2.8 0 0 5.0See Figures 5-39 and 5-40.Unlike Alternative B2, this alternative would only impact wetlands for safety enhancements at theRunway 34 End. There would be no wetland impacts at the Runway 5 (including Realigned Main Avenue), 16,or 23 Ends. The Runway 34 End would be shifted nearly 100 feet north and a portion of the RSA would beconstructed by placing fill south of the existing Runway 34 End. Alternative B4 includes a partial relocation of<strong>Airport</strong> Road in a developed area. This would not impact wetland resources, as there are no wetlands in thisarea. Alternative B4 does not require <strong>Airport</strong> Road to be fully relocated. Importantly, Alternative B4 would notdirectly impact Buckeye Brook and would avoid any impact to Wetland A5 and Wetland A10 through whichthe brook flows.Runway 34 EndSafety and taxiway enhancements associated with Runway 16-34 would impact four wetlands at theRunway 34 End and require two segments of an intermittent stream, Tributary A11, to be placed in culverts andrelocate one segment of this stream. A portion of a diffuse intermittent stream channel in Wetland A13(Tributary A) would also be filled. Direct impacts to Buckeye Brook below Warwick Pond and Wetland A10Chapter 5 - Environmental Consequences 5-199 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!