11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) Evaluation5.6.5.2 Alternative B2Construction of Partially Relocated <strong>Airport</strong> Road by 2015 would take place mostly on property owned (throughmandatory property acquisition for construction) by the <strong>Airport</strong>, could be completed in its entirety withminimal disruption to traffic flow, and would require temporary lane closures along Post Road.Full build (2020) construction impacts include temporary roadway construction impacts that would affectportions of several study area roadways. Alternative B2 would require a complex construction phasing effortalong Route 37 and Fully Relocated <strong>Airport</strong> Road due to the Fully Relocated <strong>Airport</strong> Road segment betweenLincoln Avenue and Post Road, and the new intersection and associated ramp system of Route 37, FullyRelocated <strong>Airport</strong> Road, and Post Road.5.6.5.3 Alternative B4Construction of Partially Relocated <strong>Airport</strong> Road would be complete by the end of 2015 and would take placemostly on property owned (through mandatory property acquisition for construction) by the <strong>Airport</strong>. While thiswork would require temporary lane closures along Post Road, it would result in minimal disruption to traffic flow.Construction of Realigned Main Avenue by 2015 under Alternative B4 would take place mostly on <strong>Airport</strong>property, could be completed in its entirety with minimal disruption to traffic flow, and would requiretemporary lane closures along Main Avenue.5.6.6 Cumulative ImpactsThe transportation analysis is by nature cumulative because it takes into consideration background and currentconditions as well as future actions.5.6.7 Impacts to Surface Transportation: Comparison of the No-Action Alternative andAlternatives B2 and B4This section compares the changes in daily traffic demands on Study Area roadways for Alternatives B2 and B4when compared to the No-Action Alternative.5.6.7.1 Significant ImpactsBased on the surface transportation impact analysis, Alternatives B2 and B4 would not result in significantimpacts to surface transportation because there would be no substantial reduction in the LOS of roads servingthe <strong>Airport</strong> and its surrounding communities.5.6.7.2 Vehicle Traffic ImpactsThe following paragraphs compare the projected vehicle traffic impacts, including effects on daily traffic, VMTand VHT, and peak traffic flow (level of service) of Alternatives B2 and B4.Effects on Daily TrafficTable 5-70 summarizes the AADT for Alternatives B2 and B4 compared to the No-Action Alternative for allanalysis years.Chapter 5 - Environmental Consequences 5-142 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!