11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationFAA directives require that this EIS include evidence and required consultation to support any determinationsapplicable to the approval of the ALP and the potential of federal funding. 524 FAA determinations that may berequired for the proposed Project include:• Consistency with existing plans for development of the area;• Finding of conformity with respect to the Clean Air Act (CAA) and the State Implementation Plan (SIP);• Determination of effects upon safe and efficient utilization of airspace;• Determination under U.S. Department of Transportation Section 4(f) policy on lands, wildlife andwaterfowl refuges, and historical sites;• Consistency with the approved state Coastal Zone Management <strong>Program</strong> (CZMP); and• ALP approval (FAA’s approval of the ALP will incorporate all the physical elements associated with theselected alternative).Table 8-5 T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong> Possible Permits and Approvals 1AgencyFederalArmy Corps of EngineersEnvironmental Protection AgencyNational Park Servi ceTribeNarragansett TribeStateRI Coastal Resources Management CouncilRI Department of Environmental ManagementRI Department of TransportationRI Historic Preservation and Heritage Commissi onPermit or ApprovalCWA Section 404 Individual PermitSafe Drinki ng Water Act ComplianceSection 6(f) Conversi on Approval 2NHPA Section 106 CoordinationFederal Consistency ReviewFreshwater Wetlands Alteration Permi tRhode Island Pollution Discharge Eliminati on System (RIPDES) - Stormwater Design andConstructionCWA Water Quality Section 401 Certificati onPreliminary Determination Applicati onAir Polluti on Control Permits – Minor Source Permits 2Above Ground Storage Tank Application (Fuel Farm)Underground Injecti on Control PermitSection 6(f) Conversion ApprovalPhysical Alteration PermitsCategory A/B AssentNHPA Section 106 ConcurrenceMunicipalCity of Warwi ckHistorical Cemetery Commission ApprovalSource: VHB, Inc.1 Consistency or concurrence from agencies not listed above may be required during the permit applicati on process.2 The City of Warwick will be coordinating with the Nati onal Park Service and RIDEM regarding the Section 6(f) conversion approval .3 A modified permit is required for steam boilers and emergency generators and a new permit i s required for new fuel storage tanks.524 FAA Order 1050.1E, Environmental Impacts: Policies and Procedures, FAA, United States Department of Transportation, March 20, 2006.Chapter 8 - Coordination and Consultation 8-14 July 2011\\Mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH08_Consultation_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!