11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 5-28Typical Construction Equipment Maximum Noise LevelsLmax at 50 feetLmax at 50 feetActivity Equipment (dBA) Activity Equipment (dBA)Building Demolition Excavator 81 Earthwork Scraper 84Mounted Impact Hammer (hoe ram) 90 Dozer 82Shears (on backhoe) 96 Roller 80Flat Bed Truck 74 Tractor 84Excavator 81Building Construction CraneMan Lift8175Flat Bed TruckGrader7485Grapple (on backhoe) 87 Bituminous Paving Paver 77Concrete Mixer Truck 79 Roller 80Concrete Pump TruckExcavator8181Front End LoaderVacuum Street Sweeper7982Flat Bed Truck 74 Flat Bed Truck 74Building Foundations CraneImpact Pile Driver81101Concrete Paving Concrete Mixer TruckGrader7985Vibratory Pile Driver 101 Roller 80Concrete Mixer Truck 79 Excavator 81Concrete Pump Truck 81 Flat Bed Truck 74ExcavatorGrapple (on backhoe)8187Airfield Demolition Mounted Impact Hammer (hoe ram)Excavator9081Auger Drill Rig 84 Slurry Trenching Machine 80Flat Bed Truck 74 Pavement Scarafier 90All Other Equipment > 5 HP 85Flat Bed Truck 74Source: Federal Highway Administration, Roadway Construction Noise Model, Version 1.0, February 2006; HMMH, 2008.5.3.5.2 Alternative B4Noise levels would increase during short-term construction of Alternative B4. Construction activities forAlternative B4 are anticipated to begin in 2013 with the construction of partially relocated <strong>Airport</strong> Road and theRunway 16-34 enhancements. In 2015 and 2020, noise levels would temporarily increase during the short-termconstruction activities of Alternative B4. Short-term construction activities are anticipated to extend through theend of 2020, depending on the program element under construction, and would primarily be experienced inneighborhoods south of the <strong>Airport</strong> (Oak Grove, <strong>Green</strong>wood Park, north side of Buttonwoods and StrawberryFields) due to the extension of Runway 5-23 to the south and Realigned Main Avenue. Lesser amounts oftemporary construction noise would be experienced north of the <strong>Airport</strong> (Hillsgrove and Lincoln Park) due tothe construction of the new Integrated Cargo Facility.Construction activity would mainly occur during normal working hours on weekdays. Therefore, noise impactexperienced by local residents as a result of construction activities is not expected to often occur during sleepinghours. Long-term disruptions to aircraft traffic due to runway and taxiway closures are not expected to occur,and, thus, there would be no increases in aircraft noise related to the construction activities.Chapter 5 - Environmental Consequences 5-39 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!