11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 6-11Alternative B4: Potential Wetland Mitigation Sites - Functions and ValuesMitigation Site No./Location/Wetland ID Mitigation TypeWetlandClassAcres(est.)OwnershipFunctions and Values Provided by MitigationWLH­GWR/D FFA WQ PEx F&SH WWH RECSite 1 /Onsite/WL A13Creation (includes somerestoration )PSS 3.0 RIAC P P ----Site 2 /Onsi te/Lakeshore DriveReplace culvert -- RIAC/Ci ty P P --Site 3 /Onsi te/WL A5 Restore: remove old fill sEnhance: micro-relief andplanting of wet roadsPSS/PFOPSS/PFO1.30.2RIAC -P X X P -Site 6 /Onsite Creation PSS 0.4 RIAC X X XSite 8 /Offsite/ThreePonds Brook MarshPreservation: Wetland andUpland BufferPEM/PSSBuffer32.0 Public/Private P X P X P -Site 12/OffsiteConimi cut Point MarshPXGWR/DFFAF&S HPEMPExPreservation: Coastal Estuarinewetland and upland buffer Interti dalEmergentPrinci pal Wetland Functi on or Value.Additional Wetland Function or Value likely provided by wetl and.Groundwater Recharge/Di scharge.Floodflow Alterati on.Fish and Shellfi sh Habitat.Palustrine Emergent Wetl and.Production Export.8-12 Private X P P XPFO Palustrine Forested Wetl and.PSS Palustrine Scrub-Shrub Wetl and.WLH Wildlife Habitat.WQ Water Quali ty.WWH Wildlife and Wildlife Habitat.REC Recreati on.6.9.2 Proposed Mitigation SitesOn November 4, 2010, the FAA and RIAC hosted a meeting with representatives of the City of Warwick,non-government agencies, and other stakeholders with interests in natural resource conservation including theBuckeye Brook Coalition, Save the Bay, and the Rhode Island Rivers Council. After touring the proposedwetland impact areas associated with Runway 34 safety enhancements, the group met to discuss opportunitiesfor adding new mitigation sites into the program. This meeting resulted in the addition of Site 12 which seeks topreserve properties with the Mill River 486 estuary known as the Conimicut Point Marsh. See Figure 6-2 forlocations of the potential wetland mitigation sites.Further evaluation of wetland mitigation opportunities led to a program consisting of six sites. Mitigation Site 1,3 and 6 are on the <strong>Airport</strong> and two preservation sites, Mitigation Site 8 and 12 are off the <strong>Airport</strong>. A sixth site,Mitigation Site 2, involves replacing the existing Buckeye Brook culvert under Lakeshore Drive north ofWarwick Pond. This project would enhance fish and wildlife passage between Warwick Pond and Wetland A5and would also serve to alleviate a localized flooding problem.486 The Mill River begins below the confluences of Lockwood Brook and Warner Brook with Buckeye Brook.Chapter 6 – Mitigation 6-27 July 2011\\Mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH06_Mitigation_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!