11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 5-108Alternatives B2 and B4: Areas of Federal Wetland and Waterway ImpactsAlternative B2 Alternative B4 2<strong>Program</strong> Element and Associated ActionWetlands(acres)Waterways(linear feet)Wetlands(acres)Waterways(linear feet)Runway 5 End 0 0 0 0Runway 23 End 1.5 142 1 0 0Runway 16 End 0 0 0 0Runway 34 End 2.5 510 5.0 843Partially Relocated Ai rport Road 0 0 0 0Fully Relocated Ai rport Road 1.8 121 0 0Total Federal Impacts 5.8 773 5.0 8431 Buckeye Brook, approxi mately 30 li near feet would be placed in culvert and 112 linear feet of existi ng channel relocated.2 Alternati ve B4 has no impact on the streambed of Buckeye Brook.Table 5-109Alternatives B2 and B4: Additional State-Regulated Perimeter and Riverbank Wetland Impacts(acres)<strong>Program</strong> Element and Associated Action Alternative B2 Alternative B4Runway 5 End 0 0Runway 23 End 5.2 0Runway 16 End 0 0Runway 34 End 4.9 6.5Partially Relocated <strong>Airport</strong> Road 0 0Fully Relocated <strong>Airport</strong> Road 2.4 0State Only Riverbank/Perimeter Wetland Impacts 12.5 6.5State Only Floodplain outside of other Freshwater Wetlands 0.2 0.2Vegetated Wetland (Federal and State Regulated) Impacts 5.8 5.0Total State Impacts 1 18.5 11.71 Includes vegetated wetlands under the jurisdiction of the state and federal programs plus perimeter wetland, riverbank wetland, and state-regulated floodplainimpacts associated with <strong>Airport</strong> enhancements. Areas of overlapping impact to floodplain, perimeter wetland, and/or riverbank wetland are only counted once.5.10.8 Avoidance and MinimizationMitigation of wetland impacts consists of three sequential steps: avoidance through the examination of potentialproject alternatives; minimization through the incorporation of special design measures that reduce unavoidableimpacts; and mitigation to offset unavoidable impacts that cannot be reduced through sound design measures. 406Mitigation features incorporated into Alternatives B2 and B4 considered in this section include opportunities forcompensatory mitigation for unavoidable impacts to wetlands and waterways. Proposed compensatingmitigation measures to address wetland impacts are described in Chapter 6, Mitigation.406 In accordance with the 1990 Memorandum of Agreement Between the Environmental Protection Agency and the Department of the Army Concerning theDetermination of Mitigation Under the Clean Water Act Section 404(b)(1) Guidelines.Chapter 5 - Environmental Consequences 5-204 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!