11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 5-1Alternatives B2 and B4<strong>Program</strong> Element Alternative B2 Alternative B4Safety Enhancement Elements All completed by the end of 2015 All completed by the end of 2015Upgrade Runway 16-34 Runway Safety Areas, including: X XRealign Off-<strong>Airport</strong> RoadwaysPartially Relocate <strong>Airport</strong> Road atTennessee AvenuePartially Relocate <strong>Airport</strong> Road atHasbrouck AvenueRelocate Delivery Drive X XRelocate Taxiway C X XDemolish Hangar No. 1 X XEfficiency Enhancement Elements All completed by the end of 2020 Runway 5-23 completed by the end of2015, remainder by the end of 2020)Extend Runway 5-23, including:Extend north and south to total of8,700 feetExtend south to total of 8,700 feet(Completed by the end of 2015)Realign Off-<strong>Airport</strong> Roadways 1 Fully Relocate <strong>Airport</strong> Road Realign Main Avenue(Completed by the end of 2015)Construct New Integrated Cargo Facility (Site 3) Site 3 Split Facility at Site 3Expand Passenger Terminal X XConstruct New Ground Support Equipment Facility X XConstruct New Belly Cargo Facility X XConstruct Fuel Farm X XExpand Automobile Parking Facilities X XReconfigure Terminal Access Roadways X XNote: See Figure 5-2 for Alternative B2 and Alternative B4.X Common program element.1 Runway 16-34 and Runway 5-23 would impact <strong>Airport</strong> Road differently: Runway 16-34 enhancements would result in a partial relocation of the western portion of<strong>Airport</strong> Road north of the Runway 16 End by the end of 2015, whereas Runway 5-23 extension for Alternative B2 would result in a full relocation of <strong>Airport</strong> Road to thenorth of both Runway 23 and 16 ends, connecting from Squantum Drive to Route 37 in 2020. Alternative B4 would not require a full relocation of <strong>Airport</strong> Road.5.1.2 Analysis YearsThe <strong>FEIS</strong> environmental consequences analysis assumes the following phasing schedule for Alternatives B2and B4:• 2015: Interim Build year (implementation of all Safety Enhancement Elements, including partial relocation of<strong>Airport</strong> Road. For Alternative B4 only, the extension of Runway 5-23 would be complete by the end of 2015);• 2020: Build year (all runway enhancements and other program elements, including EfficiencyEnhancements and roadway improvements completed and in operation); and• 2025: Design year (represents the future growth with all program elements in place for more than five years).For Alternative B4 only, RIAC is proposing an expedited construction schedule with the efficiency enhancementelement (the Runway 5-23 extension and associated realignment of Main Avenue) to be completed by the end of2015 along with the safety enhancements (Runway 16-34 and the partial relocation of <strong>Airport</strong> Road andDelivery Drive, demolition of Hangar No. 1, and relocation of Taxiway C). This schedule is possible forChapter 5 - Environmental Consequences 5-3 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!