11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) Evaluation3.3.6 Summary of Level 1 Screening ResultsThe Level 1 Screening of Candidate Alternatives described in this section found that:• None of the options examined under Greater Use of Existing <strong>Airport</strong>s alternative met the Purpose and Needof the T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>. In addition, none of these options were reasonable andfeasible.• The Develop a New <strong>Airport</strong> alternative does not meet the Purpose and Need, and is not reasonable andfeasible.• The options considered under the Other Non-Aviation Modes of Transportation alternative do not meet thePurpose and Need.• The New Aviation Technology alternative does not meet the Purpose and Need.• The On-<strong>Airport</strong> Enhancements alternative meets the Purpose and Need, and the selected optionsconsidered are reasonable and feasible to implement.Based on this analysis, reasonable on-<strong>Airport</strong> enhancements were advanced to the Level 2 Screening asPreliminary Alternatives.3.4 Level 2 Screening – Preliminary AlternativesSelected Candidate Alternatives advanced from the Level 1 Screening were refined and all program elementswere evaluated in the Level 2 Screening based on whether the alternative enhanced airfield safety and theefficiency of the airfield and facilities. <strong>Program</strong> elements that were not feasible or reasonable, and did not meetthe Purpose and Need were eliminated. The following project elements intended to address existing safetyconcerns at T.F. <strong>Green</strong> <strong>Airport</strong> were carried forward for Level 2 screening analysis:• Enhance Runway 16-34 RSAs (including relocating navigational aids)• Relocate Taxiway C• Demolish Hangar No. 1The following project elements intended to address existing or anticipated facility deficiencies at the T.F. <strong>Green</strong><strong>Airport</strong> were carried forward for Level 2 screening analysis:• Extend Runway 5-23 to 9,350 feet (including relocation of navigational aids)• Expand passenger terminal• Construct new ground support equipment facility• Construct new belly cargo facility• Construct new fuel farm• Construct new Integrated Cargo Facility• Expand automobile parking facilities• Reconfigure terminal access roadwaysChapter 3 – Alternatives Analysis 3-10 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH03_Alternatives_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!