11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 6-2Summary of Potential Mitigation for Compliance with Other RequirementsMitigation Measure Alternative B2 Alternative B4Noise• Continue to implement ongoing noise compatibility measures for airport operations• Acquire residential parcels exposed to noise levels of DNL dB 70 and above through participation in a voluntary landacquisition program 1• Provide sound insulation for residences exposed to noise levels at or above DNL 65 dB 2• Install noise barriers or berms along project affected roadways, as appropriate, based on RIDOT protocol (FullyRelocated <strong>Airport</strong> Road for Alternative B2 and on Main Avenue for Alternative B4)• Install Quiet Pavement on project affected roadways (Relocated <strong>Airport</strong> Road for Alternative B2 and on Main Avenuefor Alternative B4)Compatible Land Use• See Noise X X• Update Noise Land Reuse Plan X XSocioeconomic, and Environmental Justice, Children’s Health and Safety Risks• Relocate and compensate fairly, consistently, and equitably all acquired residents and businesses according to theX Xrequirements of the Uniform Relocation Act 1Surface Transportation• Relocate Park and Ride facilities and reroute RIPTA buses X X• Incorporate bicycle and pedestrian accommodation into roadway projects as appropriate• Improve intersection at Post Road/Coronado Road• Improve intersection at Main Avenue/Jefferson BoulevardXXXXHistoric, Architectural, Archaeological, and Cultural Resources• WHC 76 lies within the Future Build VLAP for noise mitigation. If abutting landowners elect to have their propertyacquired and the building is demolished, potential impacts to WHC 76 will be evaluated by FAA and RIAC inconsultation with the Warwick Historical Cemetery Commission prior to any acquisition, per stipulations contained in theMOA.• Define boundaries of WHC 77 and 78, assess potential impacts, consult with Warwick Historical Cemetery Commissionto avoid or mitigate. For the purposes of this EIS, it is assumed that the redesign of Realigned Main Avenue to avoidthe cemeteries will be implemented in final design.Water Quality• Design and construct stormwater management control systems in accordance with the 2010 RIDEM StormwaterDesign and Installation Standards ManualCoastal Resources• Design the Project to comply with the applicable performance standards, including the Special Area Management Plangoals and objectives.Hazardous Materials, Solid Waste, and Pollution Prevention• Design and construct the Project in compliance with applicable local, state, and federal laws and regulationsX Xconcerning hazardous or solid waste management 3Construction Period• Complete construction activities in compliance with the most recent edition of FAA’s Advisory Circular 150/5370-10,Standards for Specifying Construction of <strong>Airport</strong>s• Relocate the portion of the water main in <strong>Airport</strong> Road that will be under the Runway 16 RSA• Incorporate appropriate construction mitigation measures into the contract documents and specifications governing theactivities of contractors and subcontractors constructing elements of the Project 4See Tables Notes on next page.XXXXXXXXXXXXXXXXXXXXXXChapter 6 – Mitigation 6-4 July 2011\\Mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH06_Mitigation_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!