11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 5-71Alternatives B2 and B4 Compared to the No-Action Alternative: 2015, 2020, and2025 VMT/VHT Summary2015No-Action Alternative Alternative B2 Alternative B4VMT 1,147,700 1,147,200 1,152,300VHT 40,000 40,000 40,2002020No-Action Alternative Alternative B2 Alternative B4VMT 1,178,500 1,164,400 1,172,600VHT 42,400 41,400 42,2002025No-Action Alternative Alternative B2 Alternative B4VMT 1,239,700 1,224,800 1,233,500VHT 46,100 45,000 45,700Source: VHB, Inc. using the Rhode Island Statewide Travel Demand Model.Note: Shaded cells denote decreases when compared to the No-Action Alternative.VMT Vehicle miles traveled.VHT Vehicle hours traveled.Effects on Peak Hour Traffic Flow (Level of Service)Alternatives B2 and B4 would change peak hour traffic operations compared to the No-Action Alternative.Table 5-72 summarizes the effects of Alternatives B2 and B4 on peak hour traffic operations in 2015, 2020, and2025 and provides a comparison only for intersections that would see a change in overall LOS. UnderAlternatives B2 and B4, construction of new or modified intersections would meet all RIDOT requirements.In 2015, Alternative B2 would cause one location, the unsignalized driveway of Post Road at Relocated DeliveryDrive, to degrade to LOS E or LOS F.Traffic operations under Alternative B2 are expected to improve at six intersections in 2020 and six differentintersections in 2025 due in part to shifts in regional traffic from roadways throughout the City of Warwick toFully Relocated <strong>Airport</strong> Road. <strong>Improvement</strong>s are also attributed to the optimization of signal timing at anumber of intersections throughout the Study Area.In 2025, Alternative B2 would result in one intersection (Main Avenue at Jefferson Boulevard) continuing tooperate to LOS E or LOS F, compared to the No-Action Alternative. Also in 2020 and 2025, Alternative B2 wouldcause two unsignalized driveways along Post Road to degrade to LOS E or LOS F. The intersection of Post Roadat Relocated Delivery Drive does not exist under the No-Action Alternative but is projected to operate at LOS Eor LOS F under Alternative B2. The signalized intersection of Post Road at Donald Avenue is currentlyoperating at LOS D and is projected to degrade under the No-Action Alternative to LOS E or LOS F. UnderAlternative B2, the signal would be removed and the intersection would degrade to LOS E or LOS F.Chapter 5 - Environmental Consequences 5-144 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!