11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 6-23Alternative B2: Summary of Proposed Mitigation Implementation and Monitoring forMitigation for Compliance with Other RequirementsMitigati on MeasureNoise• Continue implementi ng ongoing noi se compatibili ty measures for airport operati ons• Acquire residential parcel s exposed to noi se levels of DNL 70 dB and above throughparticipati on in a voluntary l and acquisition program• Provide sound insulati on for resi dences exposed to noise l evels between DNL 65 dB and69 dB• Install noise barri ers or berms on Ai rport Road as appropri ate following RIDOT’s protocol• Install qui eter pavement for rel ocated <strong>Airport</strong> Road as appropri ateResponsiblePartyRIACRIACRIACRIACRIACProposed Implementation andEffectiveness MonitoringNANo monitori ng requi red post completi onNo monitori ng requi red post completi onNo monitori ng requi red post completi onNo monitori ng requi red post completi onCompatible Land Use• See Noise• Update Noi se Land Reuse Pl an RIAC No monitori ng requi red post completi onSocioeconomi c, and Environmental Justice, Children’s Heal th and Safety Ri sks• Rel ocate and compensate fairl y, consistently, and equitabl y all acquired residents andbusi nesses according to the requi rements of the Uniform Relocati on ActSurface Transportati on• Relocate Park and Ride faciliti es and reroute RIPTA buses• Incorporate bicycl e and pedestrian accommodation i nto roadway projects as appropri ateWater Quali ty• Design and construct stormwater management contro l systems in accordance wi th the2010 RIDEM Stormwater Design and Installation Standards ManualOngoing2105 - 20252020 – 2025RIAC No monitori ng requi red post completi on 2020 – 2025RIACRIACNo monitori ng requi red post completi onNo monitori ng requi red post completi onTiming2015 - 20202015 for Partiall y RelocatedAi rport Road, 2020 for Full yRelocated Ai rport RoadTBDPlan woul d be updated asEIS proj ects are impl ementedor withi n 18 months of thei ssuance of the ROD,whichever comes fi rst.2015Final desi gn phaseRIAC TBD Fi nal desi gn phaseCoastal Resources• Desi gn the Project to comply wi th the applicable performance standards, includi ng the RIAC NA Fi nal desi gn phaseSpecial Area Management Plan goals and objecti ves.Hazardous Materials, Solid Waste, and Pollution Preventi on• Design and construct the Project i n compli ance with applicable local, state, and federa l RIAC No monitori ng requi red post completi on Fi nal desi gn phasel aws and regulations concerni ng hazardous or soli d waste management 1Construction Period• Complete al l construction activities in compliance wi th the most recent editi on of FAA’ sAdvisory Circul ar 150/5370-10 Standards for Specifying Construction of <strong>Airport</strong>s• Relocate the portion of the water mai n in Ai rport Road that will be under the Runway 16 RSARIACMonitori ng during construction peri odDuring constructi onRIAC No monitori ng requi red post completi on Pri or to constructi on ofRunway 16 RSA• Incorporate appropriate construction mitigati on measures i nto the contract documents andspecificati ons governing the activiti es of contractors and subcontractors constructi ngel ements of the Project 2RIAC No monitori ng requi red post completi on During constructi onNotes: Refer to Table 5-132 of Chapter 5, Envi ronmental Consequences, for a summary of other envi ronmental consequences by alternati ve. No mitigation for other envi ronmentalconsequences i s required for the other environmental i mpact categories, including: Air Quality; Historic, Architectural, Archaeological, and Cultural Resources; Secti on 4(f) Resources;Fish, Wildlife, and Plants; Threatened and Endangered Species; Farmlands; Light Emissions and Visual Envi ronment; and Natural Resources and Energy Supply.RIHRA Rhode Island Histori c Resource Archive.RICRMC Rhode Isl and Coastal Resources Management Council .1 Refer to Secti on 5.17.1, Regul atory Context, of Chapter 5, Envi ronmental Consequences, for the applicable local, state, and federal laws and regulations that governhazardous materials and soli d waste.2 Refer to Table 6-16 for a summary of proposed mitigation measures related to construction activiti es.Chapter 6 – Mitigation 6-55 July 2011\\Mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH06_Mitigation_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!