11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationTable 6-14Alternative B4: Required Stormwater Storage VolumeDrainage Area2004Existing ConditionPeak Flow(cubic feet per second) 1Alternative B4Net ChangeRequiring MitigationMaximum RequiredStorage Volume(acre-feet) 2Alternative B4Buckeye Brook North 1437 1514 77 14.2Warwick Pond 85 94 9 0.3Buckeye Brook South 1025 1214 189 22.4Tuscatucket Brook 230 300 70 8.6Callahan Brook 281 245 (36) NA 3Source: VHB, Inc.1 Peak Outflow determined from hydrologic model calculations performed using HydroCAD in Appendix K, Water Quality.2 Required storage volume determined using TR-20 Preliminary Basin Sizing Analysis in Appendix K.2, Pond Sizing Analysis.3 No increase in peak flow is anticipated that would require mitigation through storage.Potential Operations and Maintenance ProceduresAs stated in the SWDM, “there are two key components to adequately maintaining a stormwater managementinfrastructure: periodic and scheduled inspections; and maintenance scheduling and performance.” Table 6-15summarizes the Operations and Maintenance (O&M) procedures that would be required for the stormwatercontrol measures that could be included in the final design of the Preferred Alternative based on the SWDM.Chapter 6 – Mitigation 6-35 July 2011\\Mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH06_Mitigation_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!