11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationConstructed by 2020, an improved Terminal Area Roadway would consist of a new Post Road “GatewayEntrance” to the <strong>Airport</strong>, South Access Road, a South Circulation Road, a Service Area Road, and alterations tothe Lower and Upper Level Terminal Roadways. The existing <strong>Airport</strong> access to Post Road south of the <strong>Airport</strong>Connector (Aviation Avenue opposite Donald Avenue) would be closed. East of the <strong>Airport</strong>, the existing<strong>Airport</strong> Road would be discontinued west of Harmony Court and it is assumed that the traffic signal at HadeCourt and Etta Street would be removed. The Fully Relocated <strong>Airport</strong> Road would be designed withappropriate accommodations for pedestrians and cyclists.Effects on Daily Traffic – 2020/2025Under Alternative B2 in 2020 and 2025, in addition to new <strong>Airport</strong>-generated traffic to the Study Area, existingnon-<strong>Airport</strong> related traffic patterns would be altered. Existing non-<strong>Airport</strong> trips would be induced to and fromStudy Area roadways as a result of expected transportation modifications. Shifts in regional traffic, unrelated tothe <strong>Airport</strong>, would occur between Post Road, Main Avenue, and other roadways throughout the region toRoute 37 and Fully Relocated <strong>Airport</strong> Road. These shifts would occur because Fully Relocated <strong>Airport</strong> Roadprovides a more direct, less congested east-west connection between Route 37 and Warwick Avenue. Once theseregional shifts occur, capacity on local roadways would increase and an opportunity for local traffic to altertravel patterns would also occur.Compared to the No-Action Alternative, Alternative B2 would decrease daily traffic on four roadway segments:• Post Road (U.S. Route 1) between Pell Avenue and Connecticut Avenue –A 33.2 percent decrease in dailytraffic in 2020 is expected between Pell Avenue and Connecticut Avenue caused by Fully Relocated <strong>Airport</strong>Road completion. In 2025, a decrease of 33.9 percent is expected;• Post Road (U.S. Route 1) between <strong>Airport</strong> Connector and Coronado Road – A 0.3 percent decrease isexpected in 2020;• <strong>Airport</strong> Connector between Jefferson Boulevard and Post Road – <strong>Airport</strong> Connector traffic would decreaseby 2.5 percent in 2020 and by 4.3 percent on this segment in 2025; and• <strong>Airport</strong> Connector between I-95 and Jefferson Boulevard: Daily traffic is expected to decrease by 2.1 percentin 2020 and by 3.6 percent in 2025.Compared to the No-Action Alternative, increases in daily traffic would occur on six roadway segments underAlternative B2:• Route 37 – Daily traffic on Route 37 between I-95 and Post Road is expected to increase by 22.1 percentcompared to the No-Action Alternative in 2020 and by 21.5 percent in 2025;• Fully Relocated <strong>Airport</strong> Road – <strong>Airport</strong> Road traffic would increase by 13.9 percent between Post Road andCommerce Drive in 2020 and by 12.8 percent in 2025;• Post Road (U.S. Route 1) – Traffic changes along Post Road from Alternative B2 in 2020 and 2025, whencompared to the No-Action Alternative, vary by location:Chapter 5 - Environmental Consequences 5-128 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!