11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) EvaluationNeighborhood Circulation Impacts – 2020/2025The roadway infrastructure modifications under Alternative B4 would alter traffic circulation through roadclosures, discontinuances, and new connections. While plans are at the conceptual level, in order toaccommodate Partially Relocated <strong>Airport</strong> Road, portions of several public streets are likely to have modifiedaccess and circulation:• <strong>Airport</strong> Road• Hasbrouck Avenue• Delivery Drive• Dewey Avenue• Hallene Road• Evergreen AvenueWhile plans are at the conceptual level, in order to accommodate Realigned Main Avenue, portions of severalpublic streets are likely to have modified access and circulation:• Main Avenue at Route 113 (alignment shift)• Gertrude Avenue• Bedford Avenue• Taft Avenue• Groveland Avenue• Walnut Glen Drive• Gladys CourtThese roadway infrastructure modifications would take place by 2015 and would remain in the same location withno additional changes to <strong>Airport</strong> Road or Main Avenue in 2020 and 2025. There are no proposed changes to trafficcontrol (stop signs or traffic signals) at any location along Main Avenue, although some traffic signals may bemodified to be more efficient if necessary. When considering roadways that may be modified, final roadwayalignments, road closures, discontinuances, and new connections would be determined by RIAC and RIDOT, andnotification to the public and affected parties would follow RIDOT protocol.5.6.5 Short-Term Impacts from Temporary Construction ActivitiesThis section provides an assessment of temporary construction-related impacts to the off-<strong>Airport</strong> surfacetransportation network associated with Alternatives B2 and B4. A construction management plan would beimplemented, as discussed in Chapter 6, Mitigation, and discussed in detail for off-roadway improvements inAppendix H, Surface Transportation.5.6.5.1 No-Action AlternativeThere are no construction impacts anticipated with the No-Action Alternative.Chapter 5 - Environmental Consequences 5-141 July 2011\\mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH05_Environmental_Cons_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!