11.07.2015 Views

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

T.F. Green Airport Improvement Program - FEIS Chapters - PVD

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong>Environmental Impact Statement and Final Section 4(f) Evaluation7.5 Use of Section 4(f) PropertiesThis section describes the use of properties under the T.F. <strong>Green</strong> <strong>Airport</strong> <strong>Improvement</strong> <strong>Program</strong> affordedprotection under Section 4(f). For a noise impact to constitute a constructive use, the noise level must be highenough to substantially impair the use and enjoyment of the impacted Section 4(f) property. The noise impactanalysis contained in Chapter 5, Environmental Consequences, includes an evaluation of potential noise impactsand concludes that Alternatives B2 and B4 would not result in a constructive use of Section 4(f) properties dueto noise. At this time, the FAA does not anticipate that any temporary occupancy of Section 4(f) propertiesduring construction as a result of the need for temporary construction easements or activities.7.5.1 Section 4(f) Impacts to Historical PropertiesFigure 7-4 shows the relationship of the No-Action Alternative and Alternatives B2 and B4 to the eligible airporthistoric district and its contributing elements.7.5.1.1 No-Action AlternativeThe No-Action Alternative would have no Section 4(f) impacts to historical properties but does not meet theproject Purpose and Need. The No-Action Alternative was included to comply with the requirements of NEPAand to provide a benchmark against which the benefits and impacts of Alternatives B2 and B4 could becompared. Based on its inability to meet the project Purpose and Need, the No-Action Alternative is feasible,but not prudent, since Hangar No. 1 would remain as an obstruction.7.5.1.2 Alternative B2Alternative B2 was developed to avoid impacts to Main Avenue and to Buckeye Brook south and north of the<strong>Airport</strong> and to minimize impacts to residential communities. Alternative B2 includes extending Runway 5-23 toa total length of 8,700 feet, which would also require fully relocating <strong>Airport</strong> Road. <strong>Airport</strong> Road is an east-westurban arterial, with commercial development at the east and west ends that connects Post Road with WarwickAvenue at Hoxsie Four Corners. Under Alternative B2, <strong>Airport</strong> Road would be partially relocated to the northby 2015 (Partially Relocated <strong>Airport</strong> Road) and fully relocated from Warwick Avenue to Post Road (FullyRelocated <strong>Airport</strong> Road) by 2020. Fully Relocated <strong>Airport</strong> Road would provide a direct connection to Route 37.An Integrated Cargo Facility would be constructed west of the Runway 23 End in the area currently occupiedby existing <strong>Airport</strong> Road.Eligible <strong>Airport</strong> Historic DistrictAlternative B2 would result in physical and constructive uses of contributing elements of the eligible airporthistoric district. Under Alternative B2, modifications and improvements to runways and taxiways at thenorthern end of the airfield would further alter the historical configuration of the airfield, resulting in anadverse effect to the eligible airport historic district and a physical use of the historic district. Specific impacts tocontributing buildings in the district, as more fully discussed below, include visual impacts to the Rhode IslandState <strong>Airport</strong> Terminal and Hangar No. 2, the demolition of Hangar No. 1, and minor physical impacts toHangar No. 2 and alteration of the runways and taxiways.Chapter 7 – Final Section 4(f)/Section 6(f) Evaluation 7-7 July 2011\\Mawatr\ev\09228.00\reports\<strong>FEIS</strong>_Final_July_2011\<strong>PVD</strong>_CH07_4(f)_JUL_2011.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!