<strong>Economic</strong> <strong>Assessment</strong> <strong>of</strong> <strong>Sanitation</strong> <strong>Interventions</strong> <strong>in</strong> <strong>Vietnam</strong> | Annex TablesTABLE A11. BACKGROUND INFORMATION ON SELECTED URBAN FIELD SITESVariable U1 U2 U3 U4 U5 U6 U7 U8Name Sa dec town Tam Ky city Hai Phong city Bai Chay town BMT city Thang town Hanoi city Cua LotownRural/urban Urban Urban Urban Urban Urban Urban Urban UrbanHouseholds 2,170 4,169 175,000 80,000 17,000 2,500 18,200 11,600Population 9,327 17,511 0.7 mio. 330,000 65,000 10,750 72,820 48,730Av. householdsizeAv. Children 90% 87% SWcollection<strong>in</strong>creasedfrom 70% to100%18% NA NA NA NA NA NA NAAusaid:A$49.98mio. for 3prov<strong>in</strong>cesGoV:A$28.34 mio.Integrated,communitybased:water supplysystems,HH watertank, ST,IEC, SWM,Institutionalsupport, IEC6 wards,<strong>in</strong>clud<strong>in</strong>gpoor5/2005 –5/2008JFPR: $1mio.GoV:$140,000Community:$60,000Infrastructureimprovement(dra<strong>in</strong>age,road), watersupply for200 HHs,HH toiletsfor 300HHs, SWM,IEC6 wards,<strong>in</strong>clud<strong>in</strong>gpoor2001 – 2007 2001 - 2007 2001 – 2007 1998 – now 12/2006 –nowF<strong>in</strong>nish Gov.$7.26 mio,WB loan $25.5mio., GoV$11.9 mio.Infrastructureimprovement(dra<strong>in</strong>age,pump<strong>in</strong>g station,ponds &lakes), septictank andconnectionimprovement,ST empty<strong>in</strong>g,septage treatment,revolv<strong>in</strong>gfund, IEC,managementcapacity300,000 HHsbenefited;7,227 HHs<strong>in</strong>volved <strong>in</strong>revolv<strong>in</strong>g fundprogram per 2mio. per HHGrant: $10.86mio, Loan:$20.28 mio.,GoV: $5.59 mio.Infrastructureimprovement(pump<strong>in</strong>g station,WWTP),septic tank andconnectionimprovement,septage treatment,SWM withlandfills, revolv<strong>in</strong>gfund, IEC,managementcapacityWW treatmentfor 1 ward <strong>in</strong> BC(93,000 persons)+ 6 wards <strong>in</strong>HG (100,000persons). SWMimprovementfor 330,000persons.11,504 HHs<strong>in</strong>volved <strong>in</strong>revolv<strong>in</strong>g fundprogramGrant;DKK121.2 mio;GoV: DKK25.0mio.Infrastructureimprovement(dra<strong>in</strong>age, lowcostsewerage,pump<strong>in</strong>g station,WWTP),HH connection,SWM,school toilets,IEC, managementcapacity5,500 HHsbenefited(21,000 persons)fromtotal 17,000HHsEstablishment<strong>of</strong> Environ.Sani.Cooperative,solid wastecollectionand disposal,IECWhole area <strong>in</strong>the townJapan:JPY 435.5mio; GoV:VND1,429mio.URENCOcapacitybuild<strong>in</strong>g,IEC, sourceseparation,compost<strong>in</strong>gor organicwasteAll HHs <strong>in</strong> 4pilot wards4/2004 –7/2007Grant:DKK1.6 mio.URENCOcapacitybuild<strong>in</strong>g,IEC, jobcreation for120 poor,SW collectionanddisposal7 wards andcommunes138<strong>Economic</strong> <strong>Assessment</strong> <strong>of</strong> <strong>Sanitation</strong> <strong>Interventions</strong>
<strong>Economic</strong> <strong>Assessment</strong> <strong>of</strong> <strong>Sanitation</strong> <strong>Interventions</strong> <strong>in</strong> <strong>Vietnam</strong> | Annex TablesTABLE A12. BACKGROUND INFORMATION ON SELECTED RURAL FIELD SITESVariable R1 R2 R3 R4 R5 R6 R7 R8 R9NameRural/urbanHouseholdsPopulationAv. householdsizeAv.Children 80% + 40% + 40.5 and42.8%NA NA NA NA + 40% NAPlan: $1.17mio, GoV:$100,000,HHs:$126,000HH toilets,water supply,IEC,capacitybuild<strong>in</strong>g forserviceproviders10,000HH toilets,2,000 HHwater supplyfacilitiesover 16communes<strong>in</strong> 3 districts.In T<strong>in</strong>hDong: 745from 1,528HHs (50%)SupportVND0.55mio. perHH, HH<strong>in</strong>vestedVND10 –20 mio.per biogassystem700 HHsfrom 2,800HHs over 4villages2003 - 2004 1998 – now 2002 – 2008 2004 – 2008 2001 –2005IDE(market<strong>in</strong>gsanitation):$150,000;HHs:$397,400Demandcreationthrough IECand capacitybuild<strong>in</strong>g forproviders54,000HHs from30 communes<strong>in</strong> 6districts <strong>of</strong>2 prov<strong>in</strong>ces(Thanh Hoaand QuangNam). Toilets<strong>in</strong>creasedfrom 8,637to 9,361IEC,Technical& f<strong>in</strong>ancialsupportfor biogasconstructionEstablishment<strong>of</strong> Environ.Sani.Cooperative,solidwaste collectionanddisposal,IECWhole area<strong>in</strong> the wardYWAM: VND0.8bio. GoV: 0.33bio., localcontrib.VND0.85bio.Improvement<strong>of</strong> dra<strong>in</strong>age,construction<strong>of</strong> demonstrationHH toilets,construction <strong>of</strong>cluster WWTP,SW separation,collection andcompost<strong>in</strong>g, IECWhole area<strong>in</strong> the village,<strong>in</strong>clud<strong>in</strong>g poorVND405mio. for biogassystemand elect.generatorConstruction<strong>of</strong>biogasand pondsystem forpig manuretreatment,electricitygenerationSupport0.55 mio.per HHtoiletSupport forHH toiletimprovement,IEC,schooltoilets, construction<strong>of</strong>demonstrationtoilet,etc.3 communes.Whole program(2001– 2005): 20prov<strong>in</strong>ces,budgetVND400 –600 mio.per yearwww.wsp.org139