02.07.2013 Views

Draft Project Impact Report - Boston Redevelopment Authority

Draft Project Impact Report - Boston Redevelopment Authority

Draft Project Impact Report - Boston Redevelopment Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exeter Residences/888 Boylston<br />

\\Mabos\projects\09916.00\docs\Permits\DPIR\Text\DPIR_Table of<br />

Contents.docx<br />

Chapter 4: Transportation<br />

4-1 Site Location Map<br />

4-2 Existing Conditions<br />

4-3 Supplemental Study Area<br />

4-4 Supplemental Traffic Counts Locations<br />

4-5 2006 Existing Condition - Weekday Morning (8am - 9am) and Evening (5pm -<br />

6pm) - Peak Hour Traffic Volumes<br />

4-6 2006 Existing Condition - Saturday (4pm - 5pm) - Peak Hour Traffic Volumes<br />

4-7 (included in DPIR text)<br />

4-8 (included in DPIR text)<br />

4-9 MBTA Bus and Transit Routes<br />

4-10 2006 Existing Condition - Weekday Morning (8am - 9am) and Evening<br />

(5pm - 6pm) - Peak Hour Pedestrian Volumes<br />

4-11 2006 Existing Condition - Saturday (4pm - 5pm) - Peak Hour Pedestrian<br />

Volumes<br />

4-12 2006 Existing Condition - Weekday Morning (8am - 9am) and Evening<br />

(5pm - 6pm) - Peak Hour Bicycle Volumes<br />

4-13 2006 Existing Condition - Saturday (4pm - 5pm) - Peak Hour Bicycle Volumes<br />

4-14 Shaw’s Supermarket – Existing Loading Area<br />

4-15 Prudential Center – North Loading Dock<br />

4-16 <strong>Project</strong> Generated Trips – Weekday Morning and Evening<br />

4-17 <strong>Project</strong> Generated Trips - Saturday<br />

4-18 2011 Full Build Condition - Weekday Morning (8am - 9am) and Evening<br />

(5pm - 6pm) - Peak Hour Traffic Volumes<br />

4-19 2011 Full Build Condition – Saturday (4pm – 5pm) – Peak Hour Traffic<br />

Volumes<br />

4-20 Exeter Residences and 888 Boylston - Vehicular Access Plan - Blue Parking<br />

Level<br />

4-21 Exeter Residences and 888 Boylston - Vehicular Access Plan - Green<br />

Parking Level<br />

Chapter 5: Environmental<br />

5-1 Wind – No Build Conditions<br />

5-2 Wind – 155-feet Conditions<br />

5-3 Wind – Proposed Conditions<br />

5-4 Shadow – 2/5 and 11/5 – No Build Conditions<br />

5-5 Shadow - 3/21 and 9/21<br />

5-6 Shadow – 5/5 and 8/5<br />

5-7 Shadow – 6/21<br />

5-8 Shadow – 10/21<br />

5-9 Shadow – 12/12<br />

Table of Contents 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!