Exeter Residences\888 Boylston<br />

\\Mabos\projects\09916.00\docs\Permits\DPIR\Text\DPIR Chapter 4<br />

Transportation081208-clean.docx<br />

level-of-service designation is for the most critical movement which is most often the<br />

left turn out of the side street. Table 4-1 shown below, presents level of service<br />

criteria as set by the HCM.<br />

Table 4-1<br />

Level of Service Criteria<br />

Level of Service<br />

Transportation 4-14<br />

Unsignalized<br />

Intersection<br />

Delay (sec/veh)<br />

Signalized<br />

Intersection<br />

Delay (sec/veh)<br />

A 0-10 0-10<br />

B >10-15 >10-20<br />

C >15-25 >20-35<br />

D >25-35 >35-55<br />

E >35-50 >55-80<br />

F >50 >80<br />

Source: Highway Capacity Manual (Transportation Research Board, 2000).<br />

The analysis utilizes the evening peak hour as the worst case scenario for analyzing<br />

network performance, since the study area performs better in the morning peak<br />

hour. This is consistent with the findings of the FEIR for the Prudential Center and<br />

the NPC/PNF.<br />

Table 4-2 presents a summary of the results of the existing conditions analysis. It<br />

should be noted that since the filing of the NPC/PNF, BTD had made several<br />

changes to the signal timing and phasing sequence to the signalized intersections in<br />

the Back Bay area. The traffic analyses presented in this DPIR were performed using<br />

an adjusted SYNCHRO model which includes signal timing and phasing<br />

adjustments as recently implemented by BTD for the entire Back Bay area. As<br />

presented in the table below, all study area intersections operate at acceptable levels<br />

of service (LOS D or better) under the existing condition during the weekday<br />

morning, weekday evening and Saturday peak. Detailed Synchro reports are<br />

included in the Technical Appendices.