Exeter Residences/888 Boylston<br />

Regulatory Context<br />

<br />

Methodology<br />

\\Mabos\projects\09916.00\docs\Permits\DPIR\Text\DPIR Chapter 5<br />

Environmental.docx<br />

Pursuant to the BRA Scoping Determination the following three study scenarios<br />

were analyzed for each study date:<br />

1. Existing Conditions<br />

2. 155-feet Zoning Height, and<br />

3. Proposed Program.<br />

As required by Section 80B(2)(b) of the City of <strong>Boston</strong> Zoning Code for Large <strong>Project</strong><br />

review, the Proponent completed a shadow study to ascertain the potential new<br />

shadow impacts resulting from the <strong>Project</strong>. This study has particular emphasis on<br />

sidewalks, parks and other public open spaces as well as the existing pedestrian<br />

plaza and courtyard areas around the existing Prudential Center AvalonBay<br />

buildings and the <strong>Boston</strong> Public Library courtyard east wall. As contemplated by<br />

Section 80B(2)(b) of the Code, the shadow study for the <strong>Project</strong> compares the<br />

Proposed Program and Existing Conditions. Furthermore, the 155-feet Zoning<br />

Height condition was also analyzed for this DPIR.<br />

The following shadow study has been prepared using methodologies consistent with<br />

accepted practices for such studies completed under Article 80 review. The analysis<br />

provides a comparison of the Existing Conditions, 155-feet Zoning Height and<br />

Proposed Program conditions. This is accomplished by using a three-dimensional<br />

CAD model of the <strong>Project</strong> area using data provided by the BRA, updated as<br />

necessary to include recently completed projects and in the case of the 155-feet<br />

Zoning Height and Proposed Program conditions, to include any approved projects<br />

within the study area. The study was completed using standard sun altitude and<br />

azimuth data for each study date estimated to occur at latitude and longitude<br />

42.36°N, 71.06°W (Table 5-4) according to Appendix 6 of BRA Development<br />

Guidelines.<br />

DRAFT - Environmental Protection 5-12