02.07.2013 Views

Draft Project Impact Report - Boston Redevelopment Authority

Draft Project Impact Report - Boston Redevelopment Authority

Draft Project Impact Report - Boston Redevelopment Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

mabos\projects\09916\graphics\fi gures\DPIR\Well Locations.indd p.1<br />

1819<br />

7.92<br />

0474<br />

N/A<br />

SHERATON TOWER<br />

BELVIDERE STREET<br />

CLEARWAY STREET CHRISTIAN<br />

B-23<br />

N/A<br />

PUBLIC ALLEY 444<br />

1199(X-6)<br />

7.41<br />

1945<br />

6.32<br />

DALTON<br />

STREET<br />

HEREFORD STREET<br />

0464<br />

5.72<br />

P-89-17<br />

8.64<br />

X-3<br />

5.22<br />

CHRISTIAN SCIENCE<br />

BROADCAST CENTER<br />

REFLECTION POOL<br />

PUBLIC ALLEY 443<br />

SHERATON TOWER NORTH<br />

SH-1<br />

-0.2<br />

SHERATON HOTEL<br />

2771<br />

6.58<br />

JOHN B. HYNES<br />

VETERANS MEMORIAL CONVENTION CENTER<br />

SH-2<br />

-0.08<br />

SHERATON<br />

SOUTH<br />

P-89-10<br />

4.74<br />

SCIENCE<br />

TOWER<br />

T-1<br />

0.85<br />

FOUNTAIN<br />

HUNTINGTON AVENUE<br />

CUMBERLAND STREET<br />

WEST ARCADE<br />

T-2<br />

0.8<br />

GLOUCESTER STREET<br />

GREENHOUSE APT.<br />

P-89-19<br />

5.86<br />

BELVIDERE<br />

P-89-11<br />

2.48<br />

P-89-9<br />

5.88<br />

E-2<br />

6.54<br />

PUBLIC ALLEY 403<br />

0537<br />

6.31<br />

NEWBURY STREET<br />

PRUDENTIAL TOWER<br />

WEST NEWTON<br />

BOYLSTON STREET<br />

NORTH-CENTRAL<br />

TOWER<br />

P-89-8<br />

6.76<br />

B-2<br />

5.59<br />

T-3<br />

0.89<br />

B01-1<br />

1.5<br />

T-4<br />

1<br />

P-89-6<br />

6.09<br />

P-89-7<br />

6.48<br />

STREET<br />

NC-2<br />

1.56<br />

P-89-21<br />

N/A<br />

GARAGE EXIT<br />

EAST ARCADE<br />

RING ROAD<br />

111<br />

HUNTINGTON<br />

TOWER<br />

PUBLIC ALLEY 442<br />

22I-0649<br />

5.05<br />

T-5<br />

0.7<br />

T-6<br />

0.85<br />

COLONNADE HOTEL<br />

PUBLIC ALLEY 402<br />

P-89-5<br />

5.91<br />

FB-1<br />

1.84<br />

ST. BOTOLPH STREET<br />

FAIRFIELD APT<br />

FAIRFIELD STREET<br />

101 HUNTINGTON<br />

TOWER<br />

GARAGE ENTRANCE<br />

APPROXIMATE LIMITS<br />

OF SEWER EASEMENT<br />

SAKS FIFTH AVENUE<br />

RING ROAD<br />

TURNPIKE EXIT RAMP<br />

HUNTINGTON AVENUE<br />

GARRISON<br />

PUBLIC ALLEY 441<br />

FAIRFIELD- BOYLSTON<br />

FB-2<br />

1.81<br />

HUNTINGTON<br />

H-2<br />

-1.5<br />

22I-0661<br />

6.41<br />

H-5<br />

1.7<br />

P-89-30<br />

6.19<br />

SE-6<br />

1.88<br />

BOYLSTON APT.<br />

2167B<br />

5.6<br />

2167A<br />

5.16<br />

STREET<br />

B02-1<br />

6.38<br />

OW05-3<br />

1.61 NC-101R<br />

1.96<br />

OW05-1<br />

1.92<br />

OW05-2<br />

1.87<br />

116 HUNTINGTON AVENUE<br />

OW-3<br />

5.54<br />

NE-10<br />

2.02<br />

PUBLIC ALLEY 401<br />

RING ROAD<br />

P-89-24<br />

N/A<br />

OW05-4<br />

N/A<br />

H-6<br />

1.6<br />

FB-3<br />

1.93<br />

HARCOURT STREET<br />

X-2<br />

5.34<br />

B02-2(U)<br />

6.07<br />

LORD & TAYLOR<br />

LORD & TAYLOR<br />

OW-2<br />

4.94<br />

FB-4<br />

1.82<br />

GLOUCESTER APT.<br />

B02-2(L)<br />

3.67<br />

FE-18<br />

N/A<br />

MARRIOT HOTEL<br />

FE-16<br />

1.98<br />

FE-17<br />

N/A<br />

LENOX<br />

HOTEL<br />

MBTA TUNNEL<br />

EXETER STREET<br />

EXETER STREET<br />

FE-19<br />

2.27<br />

A-3<br />

5.42<br />

BOSTON<br />

PUBLIC<br />

LIBRARY<br />

P-89-27<br />

3.32<br />

BLAGDEN STREET<br />

COPLEY SQUARE<br />

HOTEL<br />

EX-OW-9<br />

2.7<br />

APPROXIMATE LIMITS<br />

OF MBTA TUNNEL<br />

EXETER PLACE<br />

P-89-28<br />

3.43<br />

UNDERGROUND<br />

ENGINEERING &<br />

ENVIRONMENTAL<br />

SOLUTIONS<br />

A-4<br />

5.66<br />

LEGEND:<br />

0217<br />

4.66<br />

EXISTING SHEET PILE WALL<br />

APRIL 2008 READINGS (EL, BCB)<br />

LESS THAN EL. -1<br />

EL. -1 TO 1<br />

EL. 1 TO 3<br />

EL. 3 TO 5<br />

EL. 5 TO 7<br />

GREATER THAN EL. 7<br />

N/A: NOT ACCESSIBLE OR NOT OPERATIONAL<br />

AT TIME OF READING<br />

NOTES:<br />

1. BASEPLAN ADAPTED FROM ELECTRONIC<br />

PLANS RECEIVED FROM BOSTON PROPERTIES<br />

AND FROM GIS FILES (ESRI SHAPEFILES)<br />

CREATED BY BOSTON REDEVELOPMENT<br />

AUTHORITY (BRA) UPDATED IN 2003.<br />

2. ELEVATIONS ARE IN FEET AND REFER TO<br />

BOSTON CITY BASE (BCB) DATUM.<br />

0 100 200 400<br />

Feet<br />

Figure 5-41<br />

Well Locations<br />

PRUDENTIAL CENTER<br />

BOSTON, MASSACHUSETTS<br />

SUMMARY OF APRIL 2008 READING<br />

Exeter Residences\888 Boylston DPIR<br />

SCALE AS SHOWN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!