Exeter Residences/888 Boylston<br />

\\Mabos\projects\09916.00\docs\Permits\DPIR\Text\DPIR Chapter 1 Executive<br />

Summary.docx<br />

Public benefits are discussed in further detail in Chapter 8 and summarized in Table<br />

8-1.<br />

1.4 Summary of DPIR <strong>Project</strong> Studies /<br />

Organization of DPIR<br />

In response to the BRA Scoping Determination, the Proponent has performed the<br />

following additional studies and provided the following additional information in<br />

this DPIR to augment information submitted as part of the NPC/PNF.<br />

An expanded discussion of anticipated permits and approvals is provided in<br />

Chapter 2, including square footage built to date, existing FAR calculations and<br />

future FAR calculations taking the proposed buildings into account.<br />

An updated urban design discussion for the Exeter Residences and 888 Boylston<br />

as it relates to the Prudential Center Development Plan is provided. Design<br />

details are contained in Chapter 3, including how the <strong>Project</strong> will address the<br />

specific design requirements called for by the district zoning.<br />

Chapter 4 updates and supplements the transportation study included in the<br />

NPC/PNF. This includes additional detail on existing and proposed<br />

Exeter/Blagden Street operations; pedestrian and bicycle operational<br />

evaluations, garage capacity and management information; and measures<br />

employed to accommodate new parking nests. Information on the added transit<br />

trips represented by the <strong>Project</strong> (effect on Green Line capacity), and<br />

Transportation Demand Management (TDM) measures also have been included.<br />

Updated environmental studies were conducted to include three building height<br />

scenarios as related to wind, shadow and daylight analyses: 1) no build, 2) 155<br />

feet (existing zoning height) and 3) proposed building heights. The studies also<br />

evaluate shadow and daylight effects on the existing internal plaza and<br />

courtyard areas proximate to the existing AvalonBay buildings. Solar glare has<br />

been reviewed with respect to the Exeter Residences for the 155 feet and<br />

proposed <strong>Project</strong> height building scenarios. Details on each study are further<br />

described in Chapter 5, Environmental Protection.<br />

In response to requests for additional detail the Environmental Protection<br />

Chapter 5 also addresses earth retention system and construction methodologies.<br />

Further analysis of soil and groundwater impacts is included in Chapter 6,<br />

including groundwater mitigation/management, monitoring and recharge.<br />

A more detailed description of sustainable design practices is provided in<br />

Chapter 7, including LEED Certification Silver Standard for 888 Boylston, and<br />

Article 37 compliance for the Exeter Residences.<br />

Additional information relating to the affordable housing commitments for<br />

Exeter Residences is provided in Chapter 8, including location and size of<br />

new/additional units, affordable rent levels, market rents, waiting lists,<br />

marketing/advertising.<br />

Executive Summary 1-8