82 Guarantee/transfer <strong>of</strong><br />

guarantee:<br />

83 Training <strong>of</strong> employer's<br />

personnel:<br />

84 Replacement <strong>of</strong> defective<br />

parts and materials:<br />

issue <strong>of</strong> Completion Certificate.<br />

82.1 For works like water-pro<strong>of</strong>ing, acid and alkali resisting materials,<br />

pre-construction soil treatment against termite or any other<br />

specialized works etc. the CONTRACTOR shall invariably engage<br />

SUB-CONTRACTORS who are specialists in the field and firms <strong>of</strong><br />

repute and such a SUB-CONTRACTOR shall furnish guarantees<br />

<strong>for</strong> their workmanship to the EMPLOYER, through the<br />

CONTRACTOR. In case such a SUB-CONTRACTOR/ firm is not<br />

prepared to furnish a guarantee to the EMPLOYER, the<br />

CONTRACTOR shall give that guarantee to the EMPLOYER<br />

directly.<br />

83.1 The CONTRACTOR undertakes to provide training to Engineering<br />

personnel selected and sent by the EMPLOYER at the works <strong>of</strong> the<br />

CONTRACTOR without any cost to the EMPLOYER. The period<br />

and the nature <strong>of</strong> training <strong>for</strong> the individual personnel shall be<br />

agreed upon mutually between the CONTRACTOR and the<br />

EMPLOYER. These engineering personnel shall be given special<br />

training at the shops, where the equipment will be manufactured<br />

and/ or in their collaborator's works and where possible, in any other<br />

plant where equipment manufactured by the CONTRACTOR or his<br />

collaborators is under installation or test to enable those personnel<br />

to become familiar with the equipment being furnished by the<br />

CONTRACTOR. EMPLOYER shall bear only the to and fro fare <strong>of</strong><br />

the said engineering personnel.<br />

84.1 If during the progress <strong>of</strong> the WORK, EMPLOYER shall decide and<br />

in<strong>for</strong>m in writing to the CONTRACTOR, that the CONTRACTOR<br />

has manufactured any plant or part <strong>of</strong> the plant unsound or<br />

imperfect or has furnished plant inferior to the quality specified, the<br />

CONTRACTOR on receiving details <strong>of</strong> such defects or deficiencies<br />

shall at his own expenses within 7 (seven) days <strong>of</strong> his receiving the<br />

notice, or otherwise within such time as may be reasonably<br />

necessary <strong>for</strong> making it good, proceed to alter, re-construct or<br />

remove such work and furnish fresh equipments upto the standards<br />

<strong>of</strong> the specifications. In case the CONTRACTOR fails to do so,<br />

EMPLOYER may on giving the CONTRACTOR 7 (seven) day's<br />

notice in writing <strong>of</strong> his intentions to do so, proceed to remove the<br />

portion <strong>of</strong> the WORK so complained <strong>of</strong> and at the cost <strong>of</strong><br />

CONTRACTOR's, per<strong>for</strong>m all such works or furnish all such<br />

equipments provided that nothing in the clause shall be deemed to<br />

deprive the EMPLOYER <strong>of</strong> or affect any rights under the<br />

CONTRACT, the EMPLOYER may otherwise have in respect <strong>of</strong><br />

such defects and deficiencies.<br />

84.2 The CONTRACTOR's full and extreme liability under this clause<br />

shall be satisfied by the payments to the EMPLOYER <strong>of</strong> the extra<br />

cost, <strong>of</strong> such replacements procured including erection/installation<br />

as provided <strong>for</strong> in the CONTRACT; such extra cost being the<br />

ascertained difference between the price paid by the EMPLOYER<br />

<strong>for</strong> such replacements and the CONTRACT price portion <strong>for</strong> such<br />

defective plants and repayments <strong>of</strong> any sum paid by the<br />

EMPLOYER to the CONTRACTOR in respect <strong>of</strong> such defective<br />

plant. Should the EMPLOYER not so replace the defective plant<br />

the CONTRACTOR's extreme liability under this clause shall be<br />

limited to the repayment <strong>of</strong> all such sums paid by the EMPLOYER<br />

under the CONTRACT <strong>for</strong> such defective plant.<br />

Page 101 <strong>of</strong> 158