Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(ii) Tie-up with LG <strong>for</strong> supplying <strong>of</strong> spare parts <strong>for</strong> the 8.5 TR ductable ACs.<br />
(v) Tie-up with M/s Voltas Ltd. <strong>for</strong> six monthly checking/inspection/servicing <strong>of</strong> Voltas<br />
make system installed and to attend breakdowns as required. Documentary pro<strong>of</strong> to<br />
be submitted.<br />
(vi) To provide uni<strong>for</strong>ms and safety shoes to all the personnel working inside the<br />
premises.<br />
(vii) To provide all the materials <strong>of</strong> original make like gudgeon pins, o-ring sets, gasket<br />
sets, safety plates whenever the Compressors (Kirloskar/Voltas make) are opened<br />
up during the schedule/unscheduled <strong>maintenance</strong> as mentioned elsewhere in the<br />
tender. All these materials are required to be changed with new ones every time the<br />
Compressors are opened up. No extra payment whatsoever shall be made on this<br />
count.<br />
(iv) To provide all Log books, Registers, tools & tackles required <strong>for</strong> smooth<br />
<strong>maintenance</strong>. Pressure testing <strong>of</strong> Equipments <strong>for</strong> leakage, Vacuum pump and Gas<br />
refilling and copper tube brazing equipments should be always available at site. No<br />
extra payment whatsoever shall be made on this count.<br />
(viii) To fulfill all labor related statutory requirements.<br />
(ix) Income tax, Service tax & Works Contract Tax or any other statutory requirements<br />
applicable from time to time.<br />
(x) To supply all petty consumables like cloths <strong>for</strong> cleaning, cotton waste, grease,<br />
gasket, PVC tape, CTC/CRC <strong>for</strong> cleaning the electrical contacts, etc. at his own cost.<br />
(xi) To carryout day-to-day <strong>maintenance</strong> works including replacements <strong>of</strong><br />
materials/items as given in the tender document or new items not mentioned in the<br />
tender document.<br />
(ix) To read the Penalty clauses, payment clauses, Scope <strong>of</strong> Work, General & Special<br />
Conditions be<strong>for</strong>e quoting.<br />
(i) Maintaining all records in proper logbooks & registers to be supplied by the<br />
<strong>contract</strong>or.<br />
(ii) The successful bidder should confirm his firm’s account and also <strong>for</strong> accepting<br />
payment through e-banking mode with any one <strong>of</strong> the following banks. Necessary<br />
documentary pro<strong>of</strong>s as required by Gail to be submitted within one month from the<br />
date <strong>of</strong> award <strong>of</strong> the <strong>contract</strong>.<br />
( ) HDFC Bank<br />
( ) State Bank <strong>of</strong> India<br />
143