04.08.2013 Views

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ight <strong>of</strong> employer and<br />

liability <strong>of</strong> <strong>contract</strong>or:<br />

Charge <strong>of</strong> the EMPLOYER, nor any sum paid on account by the<br />

EMPLOYER, nor any extension <strong>of</strong> time <strong>for</strong> execution <strong>of</strong> the work<br />

granted by EMPLOYER shall affect or prejudice the rights <strong>of</strong> the<br />

Employer against the CONTRACTOR or relieve the<br />

CONTRACTOR <strong>of</strong> his obligations <strong>for</strong> the due per<strong>for</strong>mance <strong>of</strong> the<br />

CONTRACT, or be interpreted as approval <strong>of</strong> the WORK done or<br />

<strong>of</strong> the equipment supplied and no certificate shall create liability<br />

<strong>for</strong> the EMPLOYER to pay <strong>for</strong> alterations, amendments,<br />

variations or additional works not ordered, in writing, by<br />

EMPLOYER or discharge the liability <strong>of</strong> the CONTRACTOR <strong>for</strong><br />

the payment <strong>of</strong> damages whether due, ascertained, or certified or<br />

not or any sum against the payment <strong>of</strong> which he is bound to<br />

indemnify the EMPLOYER.<br />

49 Language and measures: 49.1 All documents pertaining to the CONTRACT including<br />

Specifications, Schedules, Notices, Correspondence, operating<br />

and <strong>maintenance</strong> Instructions, DRAWINGS, or any other writing<br />

shall be written in English language. The Metric System <strong>of</strong><br />

measurement shall be used in the CONTRACT unless otherwise<br />

specified.<br />

50 Transfer <strong>of</strong> title: 50.1 The title <strong>of</strong> Ownership <strong>of</strong> supplies furnished by the<br />

CONTRACTOR shall not pass on to the EMPLOYER <strong>for</strong> all<br />

Supplies till the same are finally accepted by the EMPLOYER<br />

after the successful completion <strong>of</strong> PERFORMANCE TEST and<br />

GUARANTEE TEST and issue <strong>of</strong> FINAL CERTIFICATE.<br />

50.2 However, the EMPLOYER shall have the lien on all such works<br />

per<strong>for</strong>med as soon as any advance or progressive payment is<br />

made by the EMPLOYER to the CONTRACTOR and the<br />

CONTRACTOR shall not subject these works <strong>for</strong> use other than<br />

those intended under this CONTRACT.<br />

51 Release <strong>of</strong> in<strong>for</strong>mation: 51.1 The CONTRACTOR shall not communicate or use in advertising,<br />

publicity, sales releases or in any other medium, photographs, or<br />

other reproduction <strong>of</strong> the Work under this CONTRACT or<br />

description <strong>of</strong> the site dimensions, quantity , quality or other<br />

in<strong>for</strong>mation, concerning the Work unless prior written permission<br />

has been obtained from the EMPLOYER.<br />

52<br />

53<br />

Brand names:<br />

Completion <strong>of</strong> <strong>contract</strong>:<br />

52.1 The specific reference in the SPECIFICATIONS and documents<br />

to any material by trade name, make or catalogue number shall<br />

be construed as establishing standard or quality and<br />

per<strong>for</strong>mance and not as limited competition. However,<br />

TENDERER may <strong>of</strong>fer other similar equipments provided it<br />

meets the specified standard design and per<strong>for</strong>mance<br />

requirements.<br />

53.1 Unless otherwise terminated under the provisions <strong>of</strong> any other<br />

relevant clause, this CONTRACT shall be deemed to have been<br />

completed at the expiration <strong>of</strong> the PERIOD OF LIABILITY as<br />

provided <strong>for</strong> under the CONTRACT.<br />

54 Spares: 54.1 The CONTRACTOR shall furnish to the EMPLOYER all spares<br />

required <strong>for</strong> COMMISSIONING <strong>of</strong> the plants, recommendatory<br />

and/or mandatory spares, which are required essential by the<br />

manufacturer/supplier. The same shall be delivered at SITE,<br />

3(Three) months be<strong>for</strong>e COMMISSIONING.<br />

Page 86 <strong>of</strong> 158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!