1. SUPERVISOR : 12 Man-hour/day<br />

2. ELECTRICIAN/AC AC PERATORS : 36 Man-hour/day<br />

(One Operator <strong>for</strong> Night shift duty)<br />

4. HELPER : 24 Man-hour/day<br />

The above services shall be provided <strong>for</strong> the HVAC plant on all working days.<br />

The normal timing <strong>of</strong> the running <strong>of</strong> the plant shall be 0800 hrs to 2000 hrs.<br />

However, the timing <strong>of</strong> the running <strong>of</strong> the plant may be extended beyond the<br />

operating hours as per requirement and instructions <strong>of</strong> Engineer-in-Charge. The<br />

Engineer-in-charge may also ask to run the plant on Sundays/holidays if<br />

required. No extra payment shall be given <strong>for</strong> that. Preventive<br />

<strong>maintenance</strong>/Descaling work <strong>of</strong> the HVAC plant/AHUs to be taken up on<br />

Sundays/Holidays so that there is no disruption <strong>of</strong> service during <strong>of</strong>fice hours.<br />

Service <strong>for</strong> night hours is from 2000 hrs to 0800 hrs and the same to be<br />

provided 7 days a week inclusive <strong>of</strong> holidays/Sundays.<br />

For maintaining <strong>of</strong> the Windows/Split AC systems, Water Coolers,<br />

Refrigerators, etc the <strong>contract</strong>or does not have to deploy his personnel<br />

permanently, the <strong>maintenance</strong> team is required to attend a scheduled<br />

<strong>maintenance</strong> drawn up by the <strong>contract</strong>or and approved by the EIC and as per<br />

requirement (on call basis) but the Contractor is responsible <strong>for</strong> attending all<br />

complaints promptly whenever required irrespective <strong>of</strong> time or season.<br />

The Supervisor shall be <strong>of</strong> minimum ITI trained (or equivalent)/certificate<br />

course in the field <strong>of</strong> AC system with atleast two years experience. The<br />

electrician shall be ITI trained in Electrical and with atleast one year<br />

experience in the field <strong>of</strong> AC system. The operator should have completed a<br />

course in AC system with atleast one year experience.<br />

2.15 The Contractor shall have to carry out checks including as mentioned below:<br />

Following points are only guidelines <strong>for</strong> system checking. However the<br />

Contractor will draw a complete and exhaustive schedule <strong>for</strong> the same and<br />

submitted to the EIC <strong>for</strong> approval at the start <strong>of</strong> the <strong>contract</strong>.<br />

HVAC Plant :<br />

2.15.1 ROUTINE CHECKS<br />