pr<strong>of</strong>it, etc. The Contractor should procure such item which shall be as per the<br />

manufacturer’s recommendations and approved by the Engineer-in-charge.<br />

The payment shall be made on monthly basis after necessary deduction <strong>of</strong> Income<br />

tax, WCT, etc and any other applicable statutory deductions from time to time.<br />

1.46 ORDER OF PRECEDENCE :<br />

In case <strong>of</strong> ambiguity in Schedule <strong>of</strong> Rates, General conditions, Specifications,<br />

Drawings, the following orders <strong>of</strong> precedence shall prevail :<br />

a) Telex/Telegram/Fax <strong>of</strong> Intent, detailed Letter <strong>of</strong> Intent along with<br />

statements <strong>of</strong> agreed variation and its enclosures and any<br />

corrigendum/addendum/special note to tenderers.<br />

b) Schedule <strong>of</strong> Rates<br />

c) Special Conditions <strong>of</strong> Contract<br />

d) Specifications/Drawings in conjunction with each other<br />

e) General conditions <strong>of</strong> <strong>contract</strong><br />

1.47 FINAL BILL :<br />

The Contractor shall submit his final bill <strong>for</strong> the subject work within one month <strong>of</strong><br />

completion <strong>of</strong> <strong>contract</strong> and payment shall be made within 1 (one) month <strong>of</strong> receipt <strong>of</strong><br />

the bill. The Contractor shall submit the ‘No Demand Certificate” along with the<br />

final bill.<br />

CHECKLIST FOR THE CONTRACTOR<br />

The Contractor should carefully read all the General & Special Conditions, Scope <strong>of</strong> Work,<br />

Payment terms, Penalty Clauses & other terms & Conditions etc. be<strong>for</strong>e quoting <strong>for</strong> this<br />

work. However, the checklist given below is only <strong>for</strong> ready reference:<br />

PART A:<br />

The Contractor should load the following charges in the consolidated <strong>annual</strong> fee in<br />

addition to the supply <strong>of</strong> manpower. No extra payment shall be made <strong>for</strong> these items:<br />

(i) Tie up with M/s Kirlaskar Ltd. <strong>for</strong> six-monthly checking/inspection/servicing <strong>of</strong><br />

Kirlaskar make compressors and to attend breakdowns as required. Documentary<br />

pro<strong>of</strong> to be submitted.<br />