and specifications <strong>of</strong> the work or works, and all reproductions there<strong>of</strong>.<br />
1.1.21 "SITE" shall mean the lands and other places on, under, in or through<br />
which the permanent works are to be carried out and any other lands<br />
or places provided by the EMPLOYER <strong>for</strong> the purpose <strong>of</strong> the<br />
CONTRACT.<br />
1.1.22 "NOTICE IN WRITING OR WRITTEN NOTICE" shall mean a notice in<br />
written, typed or printed characters sent (unless delivered personally or<br />
otherwise proved to have been received by the addressee) by<br />
registered post to the latest known private or business address or<br />
registered <strong>of</strong>fice <strong>of</strong> the addressee and shall be deemed to have been<br />
received in the ordinary course <strong>of</strong> post it would have been delivered.<br />
1.1.23 "APPROVED" shall mean approved in writing including subsequent<br />
written confirmation <strong>of</strong> previous verbal approval and "APPROVAL"<br />
means approval in writing including as a<strong>for</strong>esaid.<br />
1.1.24 "LETTER OF INTENT/FAX OF INTENT” shall mean intimation by a<br />
Fax/Letter to Tenderer(s) that the tender has been accepted in<br />
accordance with the provisions contained in the letter.<br />
1.1.25 "DAY" means a day <strong>of</strong> 24 hours from midnight to midnight irrespective<br />
<strong>of</strong> the number <strong>of</strong> hours worked in that day.<br />
1.1.26 "WORKING DAY" means any day which is not declared to be holiday<br />
or rest day by the EMPLOYER.<br />
1.1.27 "WEEK" means a period <strong>of</strong> any consecutive seven days.<br />
1.1.28 "METRIC SYSTEM" - All technical documents regarding the<br />
construction <strong>of</strong> works are given in the metric system and all work in the<br />
project should be carried out according to the metric system. All<br />
documents concerning the work shall also be maintained in the metric<br />
system.<br />
1.1.29 "VALUE OF CONTRACT” or “TOTAL CONTRACT PRICE” shall mean<br />
the sum accepted or the sum calculated in accordance with the prices<br />
accepted in tender and/or the CONTRACT rates as payable to the<br />
CONTRACTOR <strong>for</strong> the entire execution and full completion <strong>of</strong> the<br />
work, including change order.<br />
1.1.30 "LANGUAGE FOR DRAWINGS AND INSTRUCTION" All the<br />
drawings, titles, notes, instruction, dimensions, etc. shall be in English<br />
Language.<br />
1.1.31 "MOBILIZATION" shall mean establishment <strong>of</strong> sufficiently adequate<br />
infrastructure by the CONTRACTOR at "SITE" comprising <strong>of</strong><br />
construction equipments, aids, tools tackles including setting <strong>of</strong> site<br />
<strong>of</strong>fices with facilities such as power, water, communication etc.<br />
establishing manpower organisation comprising <strong>of</strong> Resident<br />
Engineers, Supervising personnel and an adequate strength <strong>of</strong> skilled,<br />
semi-skilled and un-skilled workers, who with the so established<br />
infrastructure shall be in a position to commence execution <strong>of</strong> work at<br />
site(s), in accordance with the agreed Time Schedule <strong>of</strong> Completion <strong>of</strong><br />
Work. "MOBILISATION" shall be considered to have been achieved, if<br />
the CONTRACTOR is able to establish infrastructure as per Time<br />
Schedule, where so warranted in accordance with agreed schedule <strong>of</strong><br />
work implementation to the satisfaction <strong>of</strong> ENGINEER-IN-CHARGE/<br />
EMPLOYER.<br />
Page 58 <strong>of</strong> 158