Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
35 Contractor's <strong>of</strong>fice at<br />
site:<br />
36 Contractor's subordinate<br />
staff and their conduct<br />
representation, promise or guarantees given or alleged to have<br />
been given to him by any person.<br />
35.1 The CONTRACTOR shall provide and maintain an <strong>of</strong>fice at the<br />
site <strong>for</strong> the accommodation <strong>of</strong> his agent and staff and such <strong>of</strong>fice<br />
shall be open at all reasonable hours to receive instructions,<br />
notice or other communications. The CONTRACTOR at all time<br />
shall maintain a site instruction book and compliance <strong>of</strong> these<br />
shall be communicated to the ENGINEER-IN CHARGE from time<br />
to time and the whole document to be preserved and handed<br />
over after completion <strong>of</strong> works.<br />
36.1 The CONTRACTOR, on or after award <strong>of</strong> the WORK shall name<br />
and depute a qualified engineer having sufficient experience in<br />
carrying out work <strong>of</strong> similar nature, to whom the equipments,<br />
materials, if any, shall be issued and instructions <strong>for</strong> works given.<br />
The CONTRACTOR shall also provide to the satisfaction <strong>of</strong> the<br />
ENGINEER-IN- CHARGE sufficient and qualified staff to<br />
superintend the execution <strong>of</strong> the WORK, competent sub-agents,<br />
<strong>for</strong>emen and leading hands including those specially qualified by<br />
previous experience to supervise the types <strong>of</strong> works comprised in<br />
the CONTRACT in such manner as will ensure work <strong>of</strong> the best<br />
quality, expeditious working. Whenever in the opinion <strong>of</strong> the<br />
ENGINEER-IN- CHARGE additional properly qualified<br />
supervisory staff is considered necessary, they shall be<br />
employed by the CONTRACTOR without additional charge on<br />
accounts there<strong>of</strong>. The CONTRACTOR shall ensure to the<br />
satisfaction <strong>of</strong> the ENGINEER-IN-CHARGE that SUB-<br />
CONTRACTORS, if any, shall provide competent and efficient<br />
supervision, over the work entrusted to them.<br />
36.2 If and whenever any <strong>of</strong> the CONTRACTOR's or SUB-<br />
CONTRACTOR'S agents, sub-agents, assistants, <strong>for</strong>emen, or<br />
other employees shall in the opinion <strong>of</strong> ENGINEER-IN- CHARGE<br />
be guilty <strong>of</strong> any misconduct or be incompetent or insufficiently<br />
qualified or negligent in the per<strong>for</strong>mance <strong>of</strong> their duties <strong>of</strong> that in<br />
the opinion <strong>of</strong> the EMPLOYER or the ENGINEER-IN-CHARGE, it<br />
is undesirable <strong>for</strong> administrative or any other reason <strong>for</strong> such<br />
person or persons to be employed in the works, the<br />
CONTRACTOR, is so directed by the ENGINEER-IN-CHARGE,<br />
shall at once remove such person or persons from employment<br />
thereon. Any person or persons so removed from the works shall<br />
not again be employed in connection with the WORKS without<br />
the written permission <strong>of</strong> the ENGINEER-IN- CHARGE. Any<br />
person so removed from the WORK shall be immediately<br />
re-placed at the expense <strong>of</strong> the CONTRACTOR by a qualified<br />
and competent substitute. Should the CONTRACTOR be<br />
requested to repatriate any person removed from the works he<br />
shall do so and shall bear all costs in connection herewith.<br />
36.3 The CONTRACTOR shall be responsible <strong>for</strong> the proper<br />
behaviour <strong>of</strong> all the staff, <strong>for</strong>emen, workmen, and others, and<br />
shall exercise a proper degree <strong>of</strong> control over them and in<br />
particular and without prejudice to the said generality, the<br />
CONTRACTOR shall be bound to prohibit and prevent any<br />
employees from trespassing or acting in any way detrimental or<br />
prejudicial to the interest <strong>of</strong> the community or <strong>of</strong> the properties or<br />
occupiers <strong>of</strong> land and properties in the neighborhood and in the<br />
Page 78 <strong>of</strong> 158