Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
68 Material procured with<br />
assistance <strong>of</strong><br />
employer/return <strong>of</strong> surplus:<br />
which can be obtained as supplied from standard<br />
manufacturer in finished <strong>for</strong>m.<br />
ix) The CONTRACTOR shall, if desired by the ENGINEER-<br />
IN-CHARGE, be required to execute an Indemnity Bond in<br />
the prescribed <strong>for</strong>m <strong>for</strong> safe custody and accounting <strong>of</strong> all<br />
materials issued by the EMPLOYER.<br />
x) The CONTRACTOR shall furnish to the ENGINEER-IN-<br />
CHARGE sufficiently in advance a statement showing his<br />
requirement <strong>of</strong> the quantities <strong>of</strong> the materials to be supplied<br />
by the EMPLOYER and the time when the same will be<br />
required by him <strong>for</strong> the works, so as to enable the<br />
ENGINEER-IN-CHARGE to make necessary<br />
arrangements <strong>for</strong> procurement and supply <strong>of</strong> the material.<br />
xi) Account <strong>of</strong> the materials issued by the EMPLOYER shall<br />
be maintained by CONTRACTOR indicating the daily<br />
receipt, consumption and balance in hand. This account<br />
shall be maintained in a manner prescribed by the<br />
ENGINEER-IN-CHARGE along with all connected papers<br />
viz. requisitions, issues, etc., and shall be always available<br />
<strong>for</strong> inspection in the CONTRACTOR's <strong>of</strong>fice at SITE.<br />
xii) The CONTRACTOR should see that only the required<br />
quantities <strong>of</strong> materials are got issued. The CONTRACTOR<br />
shall not be entitled to cartage and incidental charges <strong>for</strong><br />
returning the surplus materials, if any, to the stores<br />
wherefrom they were issued or to the place as directed by<br />
the ENGINEER-IN-CHARGE.<br />
xiii) Materials/Equipment(s) supplied by EMPLOYER shall not<br />
be utilised <strong>for</strong> any purpose(s) than issued <strong>for</strong>.<br />
68.1 Notwithstanding anything contained to the contrary in any or all the<br />
clauses <strong>of</strong> this CONTRACT where any materials <strong>for</strong> the execution<br />
<strong>of</strong> the CONTRACT are procured with the assistance <strong>of</strong> the<br />
EMPLOYER either by issue from EMPLOYER's stock or purchases<br />
made under order or permits or licences issued by Government, the<br />
CONTRACTOR shall hold the said materials as trustee <strong>for</strong> the<br />
EMPLOYER and use such materials economically and solely <strong>for</strong> the<br />
purpose <strong>of</strong> the CONTRACT and not dispose them <strong>of</strong>f without the<br />
permission <strong>of</strong> the EMPLOYER and return, if required by the<br />
ENGINEER-IN-CHARGE, shall determine having due regard to the<br />
condition <strong>of</strong> the materials. The price allowed to the<br />
CONTRACTOR, however, shall not exceed the amount charged to<br />
him excluding the storage charges, if any. The decision <strong>of</strong> the<br />
ENGINEER-IN-CHARGE shall be final and conclusive in such<br />
matters. In the event <strong>of</strong> breach <strong>of</strong> the a<strong>for</strong>esaid condition, the<br />
CONTRACTOR shall, in terms <strong>of</strong> the licences or permits and/or<br />
criminal breach <strong>of</strong> trust, be liable to compensate the EMPLOYER at<br />
double rate or any higher rate, in the event <strong>of</strong> those materials at that<br />
time having higher rate or not being available in the market, then<br />
any other rate to be determined by the ENGINEER-IN-CHARGE<br />
and his decision shall be final and conclusive.<br />
69 Materials obtained from 69.1 If the CONTRACTOR in the course <strong>of</strong> execution <strong>of</strong> the WORK is<br />
Page 95 <strong>of</strong> 158